Text |
| 2015-06-03 17:49:31 | 1ST REVIEW: FBC 2010 MECHANICAL |
| | |
| | 1) PROVIDE AC LOAD CALCULATIONS IN ACCORDANCE WITH |
| | ASHRAE/ACCA STANDARD 183, OR ACCA MANUAL N FOR THE NEW |
| | SYSTEMS- SECTION 503.2.1 FBC-10 ENERGY CONSERVATION. |
| | 2) PROVIDE VENTILATION CALCULATIONS FOR THE A2 |
| | OCCUPANCY INCLUDING A TABLE DEPICTING THE REQUIRED AND |
| | PROVIDED O/A OR EXHAUST FOR EACH ROOM OR SPACE ON THE |
| | PLAN- TABLE 403.3 FBC-10 MECHANICAL. |
| | 3) SHEET M-1: PLEASE INDICATE ALL THE DUCT SIZES ON THE |
| | PLAN: MANY ARE NOT INDICATED. |
| | 4) PLEASE LABEL THE AIR HANDLERS AS EITHER 1, 2, OR 3. |
| | 5) M-1: SHOW THE OUTSIDE AIR INTAKE DUCTS FOR THE AHU'S |
| | SHOWN BY THE CONCESSION STAND, AND OVER THE MEN'S |
| | TOILET ROOM. INDICATE THE TYPE AND SIZE OF THE DUCTS, |
| | AIR INLET LOCATION, AND TYPE AND SIZE OF INLET GRILL OR |
| | LOUVER. PLEASE NOTE, TWO COPIES OF A FL. PRODUCT |
| | APPROVAL OR MIAMI-DADE NOA WILL BE REQUIRED. |
| | 6) M-1: PROVIDE MOTORIZED DAMPERS FOR THE OUTSIDE AIR |
| | INTAKES THAT WILL AUTOMATICALLY SHUT OFF WHEN THE |
| | SYSTEMS OR SPACES ARE NOT IN USE- SECTION 503.2.4.4 |
| | FBC-10 ENERGY CONSERVATION. |
| | 7) M-1: PROVIDE EXHAUST VENTILATION PLANS AND |
| | SPECIFICATIONS FOR THE TOILET ROOMS, INCLUDING EXHAUST |
| | FAN EQUIPMENT SCHEDULES, THE TYPE AND SIZE OF EXHAUST |
| | DUCTS, DUCT RUNS, AND TERMINATION LOCATIONS. |
| | 8) M-1: INDICATE SUPPLY CFM'S AT THE 24 X 24 DIFFUSERS |
| | SHOWN ON THE PLAN AND THE LEGEND. |
| | 9) M-1: PER DETAIL NO. 2 ON M-2, SHOW THE LOCATIONS OF |
| | ALL REQUIRED DUCT SMOKE DETECTORS, AND TEST STATIONS ON |
| | THE PLAN- SEE FIRE DEPARTMENT COMMENTS REGARDING THE |
| | REQUIRED FIRE ALARM SYSTEM. |
| | 10) M-1: PROVIDE AN AIR DISTRIBUTION SCHEDULE ON THE |
| | PLAN INDICATING THE MAKES AND MODELS OF DIFFUSERS AND |
| | GRILLS. SHOW DUCT HANGING AND CONNECTION DETAILS. |
| | 11) PROVIDE CONDENSATE DISPOSAL PLANS FOR THE NEW AIR |
| | HANDLERS: SHOW THE TYPE AND SIZE OF PIPING, PIPING |
| | RUNS, AND DISCHARGE LOCATIONS- SECTION 307 FBC-10 |
| | MECHANICAL. |
| | 12) SITE SPECIFIC, WINDLOAD TIE-DOWN ENGINEERING IS |
| | REQUIRED FOR THE NEW CONDENSER STANDS ON THE ROOF- |
| | SECTION 301.12 FBC-10 MECHANICAL. PROVIDE DESIGN |
| | CRITERIA AND DESIGN PRESSURES ON THE PLANS. |
| | |
| | CHRISTOPHER COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |