| 2015-05-06 05:58:45 | 1) FROM THE SUBMITTED DRAWING, IT APPEARS THAT |
| | TUNNELING UNDER THE BUILDING WILL BE REQUIRED TO |
| | REPLACE THE SANITARY DRAIN LINES. SUBMIT DETAILS AND |
| | BACKFILLING REQUIREMENTS THAT CLEARLY SHOW HOW THE |
| | STRUCTURAL INTEGRITY OF THE CONCRETE SLAB WILL BE |
| | MAINTAINED DURING EXCAVATION AND BACKFILLING. WPB |
| | AMEND. TO 2010 FBC SEC. 107.2.1. |
| | 2) THE SCOPE OF WORK FROM THE CONTRACTOR STATES THAT A |
| | STORAGE TANK TYPE WATER HEATER IS TO BE ELIMINATED AND |
| | A TANKLESS WATER HEATER INSTALLED. AN ELECTRIC PERMIT |
| | APPLICATION ALONG WITH ELECTRIC PLANS SHALL BE |
| | SUBMITTED FOR THE INSTALLATION OF THE TANKLESS WATER |
| | HEATER AT THE TIME THE TANKLESS HEATER PERMIT IS |
| | SUBMITTED. WPB AMEND. TO 2010 FBC SEC. 105.1. |
| | 3) INDICATE ON THE PLANS IF THE TANKLESS WATER HEATER |
| | IS NEW OR EXISTING. IF NEW, SUBMIT MANUF. SPECS FOR THE |
| | HEATER. WPB AMEND. TO 2010 FBC SEC. 107.2.1 |
| | 4) THERE ARE TWO SHEETS OF A PLAN THAT SHOWS WINDOW |
| | REPLACEMENTS.WHY WAS THIS PLAN SUBMITTED? IT HAS |
| | NOTHING TO DO WITH THE PLUMBING WORK. CLARIFY. |
| | 5) SUBMIT 2 SETS OF PLUMBING PLANS. ONLY 1 SET |
| | SUBMITTED. |
| | |
| | NOTE: THERE WILL BE A HOLD PLACED ON PLUMBING |
| | INSPECTIONS UNTIL THE ELECTRICAL PERMIT APPLICATION AND |
| | GAS PERMIT APPLICATION & PLANS ARE SUBMITTED AND |
| | APPROVED AND AN ELECTRICAL PERMIT IS ISSUED.WPB AMEND. |
| | TO 2010 FBC SEC. 105, 107.2.1. |
| | |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |