Plan Review Notes
Plan Review Notes For Permit 15050015
Permit Number 15050015
Review Stop M
Sequence Number 1
Notes
Date Text
2015-05-28 09:13:571ST REVIEW: FBC 2010 MECHANICAL
  
 1) PROVIDE A VENTILATION CALCULATION FOR THE PROPOSED
 OCCUPANCY PER TABLE 403.3 FMC-10.
 INDICATE HOW MUCH AIR WILL BE PROVIDED BY THE NEW
 RTU-1.
 2) PROVIDE AC LOAD CALCULATIONS FOR RTU-1 IN ACCORDANCE
 WITH PROCEDURES DESCRIBED IN ASHRAE/ACCA STANDARD 183
 OR ACCA MANUAL N- SECTION 503.2.1 FBC-10 ENERGY.
 3) SHEET M-1: AUTOMATIC SHUTOFF DAMPERS AND CONTROLS
 FOR THE O/A SUPPLIES ARE REQUIRED FOR THE TWO AC
 SYSTEMS IN COMPLIANCE WITH SECTION 503.2.4.4 FBC-10
 ENERGY. PROVIDE DETAILS AND OPERATION SEQUENCE ON THE
 PLAN.
 4) M-1: RETURN AIR IS BEING TRANSFERRED FROM THE BREAK
 ROOM AND OTHER ROOMS AND OFFICES INTO THE CORRIDORS,
 HOWEVER A CORRIDOR CANNOT BE USED TO RETURN AIR TO THE
 UNIT- SECTION 601.2 FMC-10. PROVIDE DUCTED RETURNS FROM
 THESE ROOMS.
 5) M-1: SHOW THE DUCT SMOKE DETECTOR TEST STATIONS AND
 DESCRIBE FAN SHUT DOWN PROCEDURE OR SEQUENCE OF
 OPERATION.
 6) M-2: WIND LOAD DESIGN CRITERIA- THE ENGINEER OF
 RECORD SHALL VERIFY THE RTU AND FAN ROOF TIE-DOWN
 DETAILS WILL WITHSTAND 170 MPH WIND LOAD AND ASSOCIATED
 LATERAL AND UPLIFT PRESSURES.
 7) M-2: PROVIDE TWO COPIES OF A MIAMI-DADE NOA OR FL.
 PRODUCT APPROVAL FOR THE EXHAUST FAN ON THE ROOF.
 8) M-2: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE NEW
 RTU: SHOW TYPE AND SIZE OF PIPING, PIPING RUN, PIPING
 SUPPORT, PIPING PROTECTION FROM EXPOSURE, AND DISCHARGE
 LOCATION.
 9) M-2: INDICATE THE THICKNESS AND R-VALUE OF DUCT
 INSULATION- TABLE 503.2.7.1 FBC-10 ENERGY.
  
 CHRISTOPHER COLE
 MECHANICAL PLANS EXAMINER
 (561) 805-6719
 [email protected]
  
  
  


Account Summary | Usage Policy | Privacy Policy