| 2015-05-28 09:13:57 | 1ST REVIEW: FBC 2010 MECHANICAL |
| | |
| | 1) PROVIDE A VENTILATION CALCULATION FOR THE PROPOSED |
| | OCCUPANCY PER TABLE 403.3 FMC-10. |
| | INDICATE HOW MUCH AIR WILL BE PROVIDED BY THE NEW |
| | RTU-1. |
| | 2) PROVIDE AC LOAD CALCULATIONS FOR RTU-1 IN ACCORDANCE |
| | WITH PROCEDURES DESCRIBED IN ASHRAE/ACCA STANDARD 183 |
| | OR ACCA MANUAL N- SECTION 503.2.1 FBC-10 ENERGY. |
| | 3) SHEET M-1: AUTOMATIC SHUTOFF DAMPERS AND CONTROLS |
| | FOR THE O/A SUPPLIES ARE REQUIRED FOR THE TWO AC |
| | SYSTEMS IN COMPLIANCE WITH SECTION 503.2.4.4 FBC-10 |
| | ENERGY. PROVIDE DETAILS AND OPERATION SEQUENCE ON THE |
| | PLAN. |
| | 4) M-1: RETURN AIR IS BEING TRANSFERRED FROM THE BREAK |
| | ROOM AND OTHER ROOMS AND OFFICES INTO THE CORRIDORS, |
| | HOWEVER A CORRIDOR CANNOT BE USED TO RETURN AIR TO THE |
| | UNIT- SECTION 601.2 FMC-10. PROVIDE DUCTED RETURNS FROM |
| | THESE ROOMS. |
| | 5) M-1: SHOW THE DUCT SMOKE DETECTOR TEST STATIONS AND |
| | DESCRIBE FAN SHUT DOWN PROCEDURE OR SEQUENCE OF |
| | OPERATION. |
| | 6) M-2: WIND LOAD DESIGN CRITERIA- THE ENGINEER OF |
| | RECORD SHALL VERIFY THE RTU AND FAN ROOF TIE-DOWN |
| | DETAILS WILL WITHSTAND 170 MPH WIND LOAD AND ASSOCIATED |
| | LATERAL AND UPLIFT PRESSURES. |
| | 7) M-2: PROVIDE TWO COPIES OF A MIAMI-DADE NOA OR FL. |
| | PRODUCT APPROVAL FOR THE EXHAUST FAN ON THE ROOF. |
| | 8) M-2: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE NEW |
| | RTU: SHOW TYPE AND SIZE OF PIPING, PIPING RUN, PIPING |
| | SUPPORT, PIPING PROTECTION FROM EXPOSURE, AND DISCHARGE |
| | LOCATION. |
| | 9) M-2: INDICATE THE THICKNESS AND R-VALUE OF DUCT |
| | INSULATION- TABLE 503.2.7.1 FBC-10 ENERGY. |
| | |
| | CHRISTOPHER COLE |
| | MECHANICAL PLANS EXAMINER |
| | (561) 805-6719 |
| | [email protected] |
| | |
| | |
| | |