| Plan Review Notes For Permit 15050014 |
| Permit Number |
15050014 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-05-08 07:10:52 | 1) SHT. C-2 SHALL BE SIGNED AND SEALED BY THE ENGINEER | | | WHOSE NAME APPEARS ON THE DRAWING. F.A.C. RULE | | | 61G15-23.002. | | | 2) INDICATE THE BTU LOAD OF THE GENERATOR ON THE | | | DRAWING. HOW CAN PIPE SIZE BE CONFIRMED AS CODE | | | COMPLIANT WITHOUT KNOWING THE BTU LOAD OF THE | | | EQUIPMENT? | | | 3 )SHOW THE DISTANCE OF THE RELIEF VALVE DISCHARGE ON | | | THE TANK FROM THE UTILITY RACK. IS THIS A POSSIBLE | | | SOURCE OF IGNITION? IF SO, A DISTANCE OF 10 FT. SHALL | | | BE MAINTAINED. | | | 4) THE TANK IS LOCATED NEAR A VEHICLE GATE. PROTECTION | | | SHALL BE PROVIDED FOR THE TANK FITTING HOUSING,HOUSING | | | COVER, TANK CONNECTIONS AND PIPNG WHERE CONTAINERS ARE | | | INSTALLED WITHIN 10 FT. OF WHERE VEHICULES CAN BE | | | EXPECTED PER NFPA 58, SEC. 6.6.6 (D). | | | 5) SHOW THE DISTANCE OF THE TANK FROM THE EQUIPMENT | | | SHELTER. COMPL W/ NFPA 58 SEC.6.3.4.2. MEASUREMENTS | | | SHALL BE FROM THE PRESSURE RELIEF VALVE AND THE FILLING | | | CONNECTION OF THE TANK. NFPA 58, SEC.6.3.4.1. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | |
|