| Date |
Text |
| 2015-05-02 04:55:38 | 1) SUBMIT DOCUMENTATION THAT THE PLAN HAS BEEN SPPROVED |
| | BY THE DEPT. OF AGRICULTURE, DIVISION OF LP GAS. WPB |
| | AMENDMENTS TO 2010 FBC SEC.102.1.2, 107.2.1. |
| | 2) THE VALUE OF THIS PROJECT SEEMS LOW. SUBMIT A COPY |
| | OF THE SIGNED CONTRACT PER THE WPB AMENDMENTS TO 2010 |
| | FBC SEC. 109.3. |
| | 3) SUBMIT A SITE PLAN THAT IS LARGER AND LEGIBLE AND |
| | SHOWS ALL DETAILS. WPB AMENDMENTS TO 2010 FBC SEC. |
| | 107.2.1. |
| | 4) SUBMIT CLEAR AND LEGIBLE SPECIFICATION SHEETS FOR |
| | THE LP TANK.WPB AMENDMENTS TO 2010 FBC SEC. 107.2.1. |
| | 5) DOCUMENTS THAT BEAR THE NAME AND TITLE BLOCK OF AN |
| | ENGINEER SHALL BE SIGNED AND SEALED BY THAT DESIGN |
| | PROFESSIONAL PER THE FL. ADMINISTRATIVE CODE. |
| | SEC.61G15-23.002. SEE SHEET FROM RUSSEL PERLITA OF |
| | BERLIN DRAFTING AND ALSO FROM R.F. TUCKER FROM TIE-DOWN |
| | ENGINEERING |
| | 6) SUBMIT DETAILS FOR THE BOLLARDS.SHOW HEIGHT ABOVE |
| | GROUND, DEPTH IN GROUND, ARE DIRECT BURIAL OR IN |
| | CONCRETE. IF IN CONCRETE SUPPLY DETAILS. SHOW DIAMETER |
| | OF THE BOLLARDS AND THE CENTER TO CENTER SPACING OF THE |
| | BOLLARDS AROUND THE TANK. WPB AMENDMENTS TO 2010 FBC |
| | SEC. 107.2.1. |
| | 7) SUBMIT PIPING DETAILS FOR THE PIPING FROM THE TANK |
| | TO THE DISPENSER AND SUBMIT MANUF. SPECS THAT SHOW THE |
| | CONNECTION DIAGRAM TO THE PUMP. WPB AMENDMENTS TO 2010 |
| | FBC SEC. 107.2.1. |
| | 8) CLEARLY SHOW THE LOCATION OF THE DISPENSER ON THE |
| | SITE PLAN. |
| | 9) INSTALLATION SHALL COMPLY WITH NFPA 58 FOR THE |
| | INSTALLATION OF THE TANK & DISPENSER. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |