| 2015-05-15 10:54:25 | | | | 1ST REVIEW: FBC 2010 MECHANICAL | | | CHRISTOPHER COLE | | | | | | 1) PROVIDE SHEET M0.1. IT WAS NOT ENCLOSED WITH THE | | | SUBMITTED PLAN SETS. | | | 2) PROVIDE SIZING CALCULATIONS FOR THE FCU'S AND 1.5 | | | TON SPLIT SYSTEM- SECTION 505.2.2 FBC-10 ENERGY | | | CONSERVATION. | | | 3) INDICATE THE MAKE AND MANUFACTURER OF THE DS | | | DETECTORS ON THE PLAN, AND CLARIFY HOW THEY WILL BE | | | SUPERVISED PER SECTION 606.4.1 FMC-10. | | | 4) PROVIDE TYPICAL DETAILS FOR SUPPORT AND HANGING OF | | | THE FCU'S, AHU-1, THE DUCTWORK, AND THE CHILLED WATER | | | PIPING. | | | 5) INDICATE THE THICKNESS OF THE CHILLED WATER PIPING | | | INSULATIONS- TABLE 503.2.8 FBC-10 ENERGY CONSERVATION. | | | | | | CHRISTOPHER COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|