| Plan Review Notes For Permit 15040776 |
| Permit Number |
15040776 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-04-22 10:44:45 | 1) COPPER TUBING UTILIZED FOR GAS INSTALLATION SHALL | | | COMPLY WITH STANDARD TYPE "K" OR "L" OF ASTM B 88 OR | | | ASTM B 280 PER THE 2010 FBCR SEC. G2414.5.2. INDICATE | | | ON THE PLAN THE TYPE OF COPPER BEING INSTALLED. | | | 2) COPPER TUBING SHALL NOT BE USED IF THE GAS | | | CONCENTRATION CONTAINS MORE THAN AN AVERAGE OF 0.3 | | | GRAINS OF HYDROGEN SULFIDE PER 100 STANDARD CUBIC FEET | | | OF GAS PER THE 2010 FBCR SEC.G2414.5.2. DOCUMENTATION | | | FROM THE GAS PURVEYOR AS TO THE AMOUNT OF HYDROGEN | | | SULFIDE IN THE GAS WILL BE REQUIRED TO ALLOW THE USE OF | | | COPPE TUBING FOR THIS INSTALLATION. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|