Plan Review Notes
Plan Review Notes For Permit 15040655
Permit Number 15040655
Review Stop P
Sequence Number 2
Notes
Date Text
2015-06-19 05:50:001) SUBMIT DOCUMENTATION THAT THE POOL MAIN DRAIN
 COMPLIES WITHTHE 2010 FBC SEC. 424.1.6.5.10.2. SUBMIT
 MANUF. SPECIFICATION SHEETS FOR THE MAIN DRAIN COVER.
 2ND REQUEST.
 2) THE PLANS SHOW THE POOL WATER DISCHARGE AND THE
 FILTER TANK DRAINS DISCHARGING TO THE "ON-SITE STORM
 WATER DRAINAGE SYSTEM". CLARIFY WHAT IS MEANT BY THE
 "ON-SITE STORM WATER DRAINAGE SYSTEM." POOL WATER SHALL
 NOT DISCHARGE TO THE CITY'S STORM WATER SYSTEM PER CITY
 ORDINANCE SEC. 90-203. 2ND REQUEST
 3) SUBMIT THE MSDS SHETS FOR THE CHLORINE AND THE
 "ACID".WPB AMEND. TO 2010 FBC SEC.107.2.1.2ND REQUEST.
 4) SUBMIT MANUF. SPECIFICATIONS FOR THE CHEMICAL
 FEEDERS. THE FEEDERS SHALL COMPLY W/ANSI/NSF
 50-2007.FBC SEC.424.1.6.5.14. 2ND REQUEST
 5) THE POOL HEATERS SHALL HAVE VALVES PROVIDED WHICH
 ALLOW FOR THE ISOLATION OR THE REMOVAL OF THE HEATER
 FROMTHE SYSTEM. THE CURRENT DESIGN DOES NOT APPEAR TO
 MEET THIS REQUIREMENT. CURRENTLY THERE IS ONE VALVE
 THAT SHUTS DOWN ALL THREE HEATERS AT THE SAME TIME. SEE
 FBC 424.1.6.5.14. 2ND REQUEST.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved