| Plan Review Notes For Permit 15040655 |
| Permit Number |
15040655 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2015-06-19 05:50:00 | 1) SUBMIT DOCUMENTATION THAT THE POOL MAIN DRAIN | | | COMPLIES WITHTHE 2010 FBC SEC. 424.1.6.5.10.2. SUBMIT | | | MANUF. SPECIFICATION SHEETS FOR THE MAIN DRAIN COVER. | | | 2ND REQUEST. | | | 2) THE PLANS SHOW THE POOL WATER DISCHARGE AND THE | | | FILTER TANK DRAINS DISCHARGING TO THE "ON-SITE STORM | | | WATER DRAINAGE SYSTEM". CLARIFY WHAT IS MEANT BY THE | | | "ON-SITE STORM WATER DRAINAGE SYSTEM." POOL WATER SHALL | | | NOT DISCHARGE TO THE CITY'S STORM WATER SYSTEM PER CITY | | | ORDINANCE SEC. 90-203. 2ND REQUEST | | | 3) SUBMIT THE MSDS SHETS FOR THE CHLORINE AND THE | | | "ACID".WPB AMEND. TO 2010 FBC SEC.107.2.1.2ND REQUEST. | | | 4) SUBMIT MANUF. SPECIFICATIONS FOR THE CHEMICAL | | | FEEDERS. THE FEEDERS SHALL COMPLY W/ANSI/NSF | | | 50-2007.FBC SEC.424.1.6.5.14. 2ND REQUEST | | | 5) THE POOL HEATERS SHALL HAVE VALVES PROVIDED WHICH | | | ALLOW FOR THE ISOLATION OR THE REMOVAL OF THE HEATER | | | FROMTHE SYSTEM. THE CURRENT DESIGN DOES NOT APPEAR TO | | | MEET THIS REQUIREMENT. CURRENTLY THERE IS ONE VALVE | | | THAT SHUTS DOWN ALL THREE HEATERS AT THE SAME TIME. SEE | | | FBC 424.1.6.5.14. 2ND REQUEST. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561- | | | | | | | | | |
|