| Date |
Text |
| 2015-04-21 13:46:27 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | 1) ALL REQUIRED EXITS FROM THE EXISTING FACILITY SHALL |
| | BE MAINTAINED THROUGHT THE CONSTRUCTION PERIOD. |
| | |
| | 2) THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE |
| | SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE |
| | CONSTRUCTION PERIOD. |
| | ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER |
| | SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND |
| | BY CERTIFIED LIFE SAFETY CONTRACTORS. |
| | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, |
| | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE |
| | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL |
| | AND COMPLETE PROTECTION IS RETURNED. |
| | |
| | 3) SHEET G-101 SHOWS INCORRECT REFERENCES TO THE FIRE |
| | CODE: THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS |
| | OF THE 5TH EDITION OF FLORIDA FIRE PREVENTION CODE |
| | INCLUDING THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND |
| | ALL OTHER APPLICABLE CODES OR STANDARDS. |
| | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 13, 2010 EDITION. |
| | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 72, 2010 EDITION. |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2009 EDITION. |
| | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 10, 2010 EDITION. |
| | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. |
| | |
| | 4) SHEET G-101 SHOWS EXIT ACCESS THROUGH CORRIDOR 103 |
| | LEADING TO THE FRONT DOOR. THERE IS NO EXIT SIGN IN |
| | THAT CORRIDOR. AN EXIT SIGN IS REQUIRED IN CORRIDOR 103 |
| | DIRECTING EGRESS TO THE FRONT DOOR. |
| | |
| | |