| 2015-05-27 16:33:56 | 1ST REVIEW: FBC 2010 MECHANICAL |
| | |
| | 1) M-1: PROVIDE A VENTILATION CALCULATION PER TABLE |
| | 403.3 FMC-10. INDICATE ON THE PLAN THE REQUIRED O/A, |
| | AND THE ACTUAL O/A BEING PROVIDED BY THE EXISTING RTU. |
| | 2) M-1: PROVIDE A TOILET ROOM EXHAUST SYSTEM INCLUDING: |
| | A FAN EQUIPMENT SCHEDULE, TYPE AND SIZE OF EXHAUST |
| | DUCT, DUCT RUN, AND DUCT TERMINATION LOCATION. |
| | 3) M-1: THE METHOD OF RETURN AIR SHOWN ON THE PLAN IS |
| | CONFUSING: THERE APPEARS TO BE A MAIN RETURN DUCT |
| | RUNNING DOWN THE CORRIDOR, HOWEVER THERE IS A DETAIL ON |
| | THE PLAN INDICATING A TRANSFER SYSTEM POSSIBLE FROM THE |
| | ROOMS TO THE CORRIDOR. |
| | PLEASE NOTE THAT USING THE CORRIDOR AS A MEANS OF |
| | RETURN AIR IS NOT PERMITTED PER SECTION 601.2 FMC-10. |
| | INDICATE THE TYPE AND SIZE OF ALL RETURN DUCTS ON THE |
| | PLAN TO CLARIFY. |
| | 4) M-1: PLEASE REVIEW BUILDING PLAN REVIEW COMMENTS |
| | REGARDING THE NEW OUTDOOR EQUIPMENT SCREENING |
| | STRUCTURE. CLARIFY HOW THE ROOM WILL BE VENTILATED. |
| | 5) M-1: TYPICALLY DENTAL VACUUM SYSTEMS ARE EQUIPPED |
| | WITH AIR/WATER SEPARATORS THAT REQUIRE DRAINAGE: |
| | PROVIDE A MEANS AND SUBMIT MANUFACTURER'S SPECS FOR |
| | BOTH THE VACUUM AND THE COMPRESSOR. |
| | PLEASE NOTE THAT THE VACUUM MAY REQUIRE AN EXHAUST |
| | SYTEM AS WELL: PROVIDE DETAILS. |
| | |
| | CHRISTOPHER COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |