| Date |
Text |
| 2015-10-29 13:01:23 | 2ND REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15040554 |
| | 10/29/15 |
| | |
| | 1) COMMENTS #2, 3, & 4 FROM THE 1ST REVIEW STILL EXIST. |
| | I AM REPRINTING THEM BELOW FOR RE-REVIEW: |
| | |
| | 2) M2: GENERAL NOTE #12 INDICATES THAT CO2 SENSORS WILL |
| | MONITOR THE QUALITY OF AIR IN THE SPACE, HOWEVER NO |
| | SENSORS ARE SHOWN ON THE PLANS. |
| | PLEASE CLARIFY HOW THIS SYSTEM DESIGN IS MEETING THE |
| | INTENT OF TABLE 403.3 FMC-10, AND TABLE 6-4 ASHRAE 62.1 |
| | WHICH REQUIRES CAPTURING THE CHEMICAL FUMES AT THEIR |
| | SOURCES AND EXHAUSTING THEM FROM THE SPACE (SEE |
| | FOOTNOTE H PRINTED BELOW). |
| | THE DESIGN DOES NOT INDICATE ANY EXHAUST HOODS OR DUCTS |
| | AT THE STATIONS. IN ADDITION, PLEASE CLARIFY IF THE CO2 |
| | SENSORS WILL ACTIVATE THE SYSTEM UPON DETECTION OF |
| | CHEMICAL FUMES. |
| | 3) PROVIDE TWO COPIES OF MIAMI-DADE NOA'S OR FL. |
| | PRODUCT APPROVALS FOR THE AC STAND, AND THE INTAKE AND |
| | EXHAUST LOUVERS. |
| | 4) PROVIDE MANUFACTURER'S SPECIFICATIONS (CUT SHEET) |
| | FOR THE EXHAUST FAN. |
| | |
| | 5) THE REVISED PLAN INDICATES A TRANSFER DUCT FROM THE |
| | NAIL AREA TO THE RETAIL AREA. PLEASE REFER TO TABLE |
| | 403.3 FOOTNOTE B AND H, AND REVISE THE PLAN TO MEET |
| | COMPLIANCE. |
| | B. MECHANICAL EXHAUST REQUIRED AND THE RECIRCULATION OF |
| | AIR FROM SUCH SPACES IS PROHIBITED (SEE SECTION |
| | 403.2.1, ITEM 3). |
| | H. FOR NAIL SALONS, EACH NAIL STATION SHALL BE PROVIDED |
| | WITH A SOURCE CAPTURE SYSTEM CAPABLE OF EXHAUSTING NOT |
| | LESS THAN 50 CFM PER STATION. |
| | |
| | PLEASE CORRECT THE PLANS IN ACCORDANCE WITH THE |
| | COMMENTS LISTED ABOVE. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |