| 2015-05-09 16:17:08 | REVISE YOUR PLANS IN RESPONSE TO THE FOLLOWING REVIEW |
| | COMMENTS: |
| | |
| | PLEASE KEEP THE FOLLOWING ELEMENTS IN MIND WHEN |
| | PREPARING YOUR SIGNAGE DESIGN DOCUMENTS: |
| | |
| | 1) PROVIDE PLANS WITH A CLEARLY DEFINED SCOPE OF WORK. |
| | THE PERMIT APPLICATION STATES THE PURPOSE TO BE FOR THE |
| | INSTALLATION OF SIGNAGE. THE PLANS HOWEVER INDICATE |
| | POLES FOR CAMERAS AND FIBER OPTICS, AND DO NOT APPEAR |
| | TO INDICATE ANYTHING RELATED TO THE INSTALLATION OF |
| | SIGNAGE. |
| | |
| | 2) ELECTRIC SIGNS, SECTION SIGNS, AND OUTLINE LIGHTING, |
| | FIXED, MOBILE, OR PORTABLE, SHALL BE LISTED AND |
| | INSTALLED IN CONFORMANCE WITH THAT LISTING, UNLESS |
| | OTHERWISE APPROVED BY SPECIAL PERMISSION. 600.3 |
| | LISTING. |
| | |
| | 3) EACH SIGN AND OUTLINE LIGHTING SYSTEM, OR FEEDER |
| | CIRCUIT OR BRANCH CIRCUIT SUPPLYING A SIGN OR OUT-LINE |
| | LIGHTING SYSTEM, SHALL BE CONTROLLED BY AN EXTERNALLY |
| | OPERABLE SWITCH OR CIRCUIT BREAKER THAT WILL OPEN ALL |
| | UNGROUNDED CONDUCTORS WITHIN SIGHT OF THE SIGN NEC |
| | 600.6(A)(1) |
| | |
| | 4) ALL EXTERIOR LIGHTING NOT EXEMPTED BY FBC 505.1 |
| | SHALL HAVE AUTOMATIC CONTROLS TO TURN OFF AT DAYLIGHT |
| | OR WHEN NOT REQUIRED. CONTROLS SHALL BE PHOTOSENSOR & |
| | TIME CLOCK OR ASTRONOMICAL TIME SWITCH. ALL TIME |
| | SWITCHES SHALL BE CAPABLE OF RETAINING PROGRAMING |
| | DURING A LOSS OF POWER FOR A MINIMUM OF 10 HOURS. FBC-E |
| | 505.2.4 |
| | |
| | 5) PROVIDE PROOF OF OVERALL VALUE OF THE PROJECT IS |
| | REQUIRED AND SHALL BE THE TOTAL REPLACEMENT VALUE TO |
| | INCLUDE ARCHITECTURAL DESIGN FEES, FABRICATION, |
| | STRUCTURAL, AND ELECTRICAL, PLUS OVERHEAD AND PROFIT. |
| | FINAL PERMIT VALUATION SHALL BE SET BY THE BUILDING |
| | OFFICIAL. FBC WPB AMENDMENTS. SECTION 109.3 |
| | |
| | |