| Date |
Text |
| 2015-06-24 17:20:20 | RECOVERY ROOF FOURTH BUILDING REVIEW CHECKLIST. |
| | CODE: 2010 FBC. |
| | |
| | 1- NEW FLORIDA PRODUCT APPROVAL FL5680-R14 SUBMITTED: |
| | SELECTED RECOVERY ASSEMBLY R-28 CAN NOT BE USED BECAUSE |
| | THIS ASSEMBLY MAXIMUM DESIGN PRESSURE IS - 75 PSF. THIS |
| | DESIGN PRESSURE DOESN'T MEET THE DESIGN PRESSURES |
| | CALCULATED BY THE ENGINEER ON THE ECS REPORT SUBMITTED. |
| | NOTE #9 ON PAGE 2 OF 76 STATES "FOR FULLY BONDED |
| | ASSEMBLIES, THE MAXIMUM DESIGN PRESSURE FOR THE |
| | SELECTED ASSEMBLY SHALL MEET OR EXCEED CRITICAL DESIGN |
| | PRESSURE DETERMINED IN ACCORDANCE WITH FBC CHAPTER 16, |
| | AND NO RATIONAL ANALYSIS IS PERMITTED." |
| | |
| | NOTE: PER CONVERSATION WITH ROBERT BROWN (BUILDING |
| | OFFICIAL) THERE ARE TWO OPTIONS SINCE THE PROPOSED |
| | RECOVERY ASSEMBLY IS A FULLY BONDED ASSEMBLY: |
| | |
| | A) PROVIDE AN APPROVED ASSEMBLY THAT MEETS THE DESIGN |
| | PRESSURES FOR ALL ROOF ZONES. OR |
| | |
| | B) HIRE AN STATE CERTIFIED ROOFING CONSULTANT TO |
| | PROVIDE COMPLETE ANALYSIS OF PROPOSED ROOFING ASSEMBLY. |
| | FOR THIS OPTION, PLEASE CONTACT ROBERT BROWN |
| | (561)805-6652 FOR PROPER DOCUMENTATION. |
| | |
| | |
| | NOTE: |
| | MOISTURE TEST SUBMITTED DOESN'T MEET THE STANDARD |
| | PROCEDURES FOR ROOF MOISTURE SURVEYS (TAS 126-95). |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | (561)805-6712 |
| | [email protected] |