| Date |
Text |
| 2015-04-27 09:45:21 | 4/27/2015 |
| | PROJECT: 312 BARCELONA |
| | PERMIT#: 15040124 |
| | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC |
| | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | 1STELECTRICAL PLAN REVIEW OF REVISION #15040124 |
| | ACTION: DENIED |
| | |
| | DUPLICATE COMMENTS: |
| | |
| | 1) PROVIDE A REVISED FLOOR PLAN INDICATING THE |
| | ELECTRICAL SERVICE AND EACH OF THE PANEL LOCATIONS. THE |
| | RISER INDICATES PANEL "B" IS A PART OF THE SERVICE |
| | ENTRANCE SWITCHGEAR HOWEVER THE PANEL SCHEDULE FOR |
| | PANEL "B" INDICATES THE LOCATION BEING IN THE LAUNDRY |
| | ROOM. PLEASE CLARIFY THIS. WPB AMENDMENTS TO FBC |
| | 107.3.2 |
| | |
| | 2) FULL SIZE FEEDERS ARE REQUIRED TO FEED PANELS A AND |
| | B. NEC 210.15(B)(6) |
| | "FOR APPLICATION OF THIS SECTION, THE MAIN POWER FEEDER |
| | SHALL BE THE FEEDER BETWEEN THE MAIN DISCONNECT AND THE |
| | PANELBOARD THAT SUPPLIES, EITHER BY BRANCH CIRCUITS OR |
| | BY FEEDERS, OR BOTH, ALL LOADS THAT ARE PART OR |
| | ASSOCIATED WITH THE DWELLING UNIT." |
| | |
| | 3) PROVIDE A PANEL SCHEDULE FOR EACH OF THE PANELS ON |
| | THE RISER DIAGRAM. NEC 215.5 |
| | |
| | 4) PROVIDE A LOAD CALCULATION FOR THE SERVICE. NEC |
| | 220.16 |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. SEE LINK: |
| | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| | |
| | ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED |
| | PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE |
| | PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE |
| | REVIEW. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |