| Date |
Text |
| 2015-04-27 15:44:28 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) SHEET G 101, PROVIDE NOTES INDICATING; THE PROPOSED |
| | PROJECT SHALL MEET THE REQUIREMENTS OF THE 5TH EDITION |
| | OF FLORIDA FIRE PREVENTION CODE INCLUDING THE 2012 |
| | EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER APPLICABLE |
| | CODES OR STANDARDS. |
| | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 13, 2010 EDITION. |
| | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 72, 2010 EDITION. |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2009 EDITION. |
| | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. |
| | |
| | 2) SHEET G101, PROVIDE A HORIZONTAL FRONT VIEW DRAWING |
| | OF THE FIRE PLACE UNIT INDICATING DIMENSIONS OF STEEL |
| | WALL AND TO NEAREST COMBUSTIBLES. |
| | |
| | 3) SHEET G101, PROVIDE A NOTE, THE NATURE OF THE |
| | REMODEL REQUIRES AN EVALUATION OF THE FIRE ALARM AND |
| | SPRINKLER SYSTEM FOR CODE COVERAGE AND COMPLIANCE. |
| | THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE |
| | SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE |
| | CONSTRUCTION PERIOD. |
| | ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER |
| | SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND |
| | BY CERTIFIED LIFE SAFETY CONTRACTORS. |
| | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, |
| | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE |
| | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL |
| | AND COMPLETE PROTECTION IS RETURNED. |
| | |
| | 4) ADDRESS BUILDING COMMENTS. |
| | |
| | 5) ADDITIONALL COMMENTS MAY BE GENERATED ON REVIEW OF |
| | THE PROVIDED ADDITIONAL INFORMATION NOTED ABOVE. |
| | |