| 2015-09-16 17:16:12 | 2ND REVIEW: FBC 2010 MECHANICAL |
| | PERMIT #15031312 |
| | 333 FERN ST. |
| | |
| | PLEASE REFER TO THE 1ST REVIEW COMMENTS AND THE |
| | SUBMITTED NARRATIVE RESPONSE. |
| | |
| | 1) COMMENT #1 FROM THE 1ST REVIEW, REQUEST FOR AC |
| | CALCULATIONS: THE CALCULATIONS HAVE BEEN SUBMITTED |
| | HOWEVER, PLEASE REVIEW UPLOADED FILE TITLED "ISIS |
| | COMMON AREAS" I AM FINDING SOME OF THE SYSTEM TITLES ON |
| | THE CALCS DO NOT MATCH THE SYSTEM TITLES ON THE |
| | SCHEDULES I.E. AC 2-2 IS TITLED "ELEVATOR SERVICE" IN |
| | THE CALCS BUT LISTED AS 2ND LEVEL VESTIBULE IN THE |
| | SCHEDULE, AC-2-5 IN THE CALCS BUT NOT IN THE SCHEDULES. |
| | IN ADDITION, I AM NOT FINDING CALCULATIONS FOR RTU-1, |
| | AND PACU-1 & 2, AND ALL OF THE MITSUBISHI GROUND FLOOR |
| | SYSTEMS HAVE OVERSIZED HEATING CAPACITIES PER THE |
| | CALCS- REFER TO SECTION 503.2.2 FBC-10 ENERGY |
| | CONSERVATION. |
| | 2) COMMENT #2 FROM THE 1ST REVIEW, REQUEST FOR ENERGY |
| | CALCS: ENERGY EFFICIENCY FORM 506-2010 HAS BEEN |
| | SUBMITTED, HOWEVER THERE ARE A FEW ISSUES CORRELATING |
| | THE CALCS WITH THE AC SYSTEMS: A) REFER TO SHEET M4.00 |
| | "SPLIT AC UNIT SCHEDULE"- CU'S 4A & 5A ARE NOT IN THE |
| | CALCS. B) M4.00 "DUCTLESS SPLIT SYSTEM COMMON AREAS"- |
| | THE SCHEDULE INDICATES 2.0 TON/20.7 SEER SYSTEMS FOR |
| | RETAIL, HOWEVER THE CALCS INDICATE RETAIL A (40,800 |
| | BTU'S/19 SEER) & RETAIL B (19,000 BTU'S/20 SEER). C) |
| | M.400 "DUCTLESS SPLIT SYSTEM COMMON AREAS"- THE COOLING |
| | AND HEATING CAPACITIES AND SEERS IN THE SCHEDULE DON'T |
| | MATCH WITH THE CALCS. D) M4.01 "SPLIT AIR CONDITIONING |
| | UNIT SCHEDULE"- THE COOLING AND HEATING CAPACITIES, THE |
| | TAG #S, THE SEERS, AND THE LOCATIONS OF THE SYSTEMS AS |
| | SHOWN IN THE SCHEDULE DO NOT MATCH THE CALCS. PLEASE |
| | REVIEW AND REVISE ACCORDINGLY, AND COMPLETE THE |
| | COMPLIANCE CHECKLIST ON PAGE 31- PLACE A CHECK MARK IN |
| | EACH APPLICABLE BOX. |
| | 3) COMMENT #4 FROM THE 1ST REVIEW: MANUFACTURER'S |
| | SPECIFICATIONS FROM CARRIER AND MITSUBISHI HAVE BEEN |
| | UPLOADED FOR REVIEW, HOWEVER MANY OF THE SHEETS SHOWING |
| | PIPE DIAGRAMS ARE CUT-OFF ON THE RIGHT SIDES OF THE |
| | PAGES LEAVING INCOMPLETE DIAGRAMS- PLEASE CORRECT. IN |
| | ADDITION, THE SECOND PART OF THE COMMENT REGARDING PIPE |
| | PENETRATION SEALS WAS NOT ADDRESSED IN THE RESPONSE |
| | NARRATIVE. |
| | 4) COMMENT #5: THE O/A CALCULATIONS FOR THE FITNESS |
| | CENTERS ARE NOT IN COMPLIANCE WITH TABLE 403.3.- 20 CFM |
| | PER PERSON/0.06 CFM PER SQ. FT. REQUIRED. |
| | 5) COMMENT #9C: I HAVE REVIEWED SHEET E5.2.1 AND DO NOT |
| | SEE ANY DIRECT CORRELATION BETWEEN THE GENERATOR AND |
| | THE SMOKE CONTROL SYSTEM. PLEASE INDICATE WHICH OF THE |
| | CONNECTED METER CENTERS CONTAINS THE FAN CIRCUITRY. |
| | 6) COMMENT #14: REFER TO SHEET M4.07 AND CORRECT THE |
| | NOTE SPECIFYING CO LEVEL SETPOINT AT 35PPM TO READ |
| | 25PPM PER SECTION 404.1 FBC-10 MECHANICAL. |
| | 7) COMMENT #15: REFER TO TABLE 403.3 FOR FITNESS CENTER |
| | O/A. THE TABLE INDICATES 20 CFM PER PERSON AND 0.06 PER |
| | SQ. FT. PLEASE REVISE THE SCHEDULE AND PLANS. |
| | 8) COMMENT #16: PROVIDE SIZING CALCULATIONS FOR THE |
| | RETURN AIR PLENUM SMOKE EXHAUST SYSTEM SHOWN ON THE |
| | GROUND FLOOR. |
| | 9) COMMENT #18: THE REVISED PLAN DOES NOT CLEARLY |
| | INDICATE THE REQUIRED 10' CLEARANCE DISTANCE FOR THE |
| | GENERATOR EXHAUST TO THE SWITCH GEAR ROOM AIR INTAKE. |
| | 10) COMMENT #20: PROVIDE UL TESTED AND APPROVED |
| | ASSEMBLY DETAILS FOR CONSTRUCTION OF THE 2HR FIRE-RATED |
| | ENCLOSURE HOUSING THE POOL EQUIPMENT COMBUSTION AIR |
| | INTAKE. |
| | 11) COMMENT #25: PLEASE SUBMIT MANUFACTURER'S |
| | SPECIFICATIONS FOR THE DRYERS, AS PREVIOUSLY REQUESTED. |
| | 12) COMMENT #26: THE LOUVER NOA #10-0921.10 LISTED IN |
| | THE SCHEDULE HAS EXPIRED. PLEASE PROVIDE A CURRENT NOA |
| | # AND SUBMITTAL. |
| | 13) COMMENT #27: THE REQUESTED WIND LOAD ENGINEERING |
| | FOR THE ROOF TOP AC UNITS AND OTHER EQUIPMENT IS |
| | INCOMPLETE PENDING STRUCTURAL ENGINEER'S DESIGN |
| | CRITERIA AND DETAILS. PLEASE REFER TO M2-9-1 AND |
| | PROVIDE TIE-DOWN DETAILS FOR ALL EQUIPMENT AND |
| | COMPONENTS INCLUDING THE RTU, PACU'S, AC CONDENSERS AND |
| | STANDS, THE SUPPLY AND EXHAUST DUCTWORK, THE STAIRWELL |
| | PRESSURIZATION FANS, FAN CURBS, LOUVERS, ETC. |
| | 14) PROVIDE AIR DISTRIBUTION SCHEDULES INDICATING THE |
| | VARIOUS MAKES AND MODELS OF SUPPLY DIFFUSERS, RETURN |
| | AND TRANSFER GRILLS ETC. TO BE UISED IN THE COMMON |
| | AREAS AND THE APARTMENTS |
| | 15) PROVIDE UL TESTED AND APPROVED ASSEMBLY DETAILS FOR |
| | CONSTRUCTION OF THE 2HR FIRE-RATED ENCLOSURES HOUSING |
| | THE STAIRWELL PRESSURIZATION DUCTS ON THE GROUND FLOOR. |
| | 16) SMOKE CONTROL RATIONAL ANALYSIS: REFER TO THE |
| | SECTION ENTITLED "SYSTEM IMPLEMENTATION REQUIREMENTS" |
| | AND PROVIDE PRODUCT DATA SHEETS FOR THE SMOKE CONTROL |
| | FANS WITH REVIEW AND APPROVAL STAMPS AND SIGNATURES |
| | FROM THE ENGINEER OF RECORD. B) PROVIDE ON THE |
| | MECHANICAL PLANS AIR EQUIPMENT SCHEDULES FOR ALL |
| | COMPONENTS OF THE SMOKE CONTROL SYSTEM INCLUDING DUCTS, |
| | DIFFUSERS, RETURN GRILLS, DAMPERS ETC, SMOKE DETECTORS |
| | ETC. PLEASE INCLUDE NOTES FOR ITEMIZING ALL REQUIRED |
| | TESTING PROCEDURES AS OUTLINED IN THE RATIONAL ANALYSIS |
| | INCLUDING LEAK TESTING OF DUCTWORK AND DAMPERS PURSUANT |
| | TO THE SYSTEM REQUIREMENTS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |
| | |