| 2015-06-19 17:01:42 | NOTE: BUILDING REVIEW MAY BE APPROVED WITH PROVISO. |
| | BELOW COMMENTS MAY BE ADDRESSED AFTER PERMIT IS ISSUED. |
| | REVISION FEES WILL APPLY. |
| | |
| | |
| | |
| | ORIGINAL COMMENT: |
| | 1- WINDOWS AND DOORS DESIGN PRESSURES SHOWN ON SHEET |
| | SP-1 DON'T CORRESPOND TO THE WORST CASE SCENARIO FOR |
| | EXPOSURE "D". REVISE AS REQUIRED. SEC. R301.1 OF 2010 |
| | FBC-RESIDENTIAL. |
| | |
| | RESPONSE: |
| | THE BUILDING EXPOSURE WAS CHANGED TO "C". THE BUILDING |
| | EXPOSURE FOR THIS BUILDING IS "D". ORIGINAL PLANS HAD |
| | THE CORRECT BUILDING EXPOSURE "D". IT WAS THE DESIGN |
| | PRESSURES THAT WERE INCORRECT. THAT'S WHY I DIDN'T ASK |
| | TO CHANGE THE BUILDING EXPOSURE. ONLY THE DESIGN |
| | PRESSURES. RESPONSE LETTER FROM THE ARCHITECT ONLY |
| | TAKES INTO CONSIDERATION A WIND EXPOSURE FROM THE EAST |
| | SIDE. NEED TO TAKE INTO CONSIDERATION EACH WIND |
| | DIRECTION. SEE SEC. R301.2.1.4. (I MET WITH ROBERT |
| | BROWN, BUILDING OFFICIAL, FOR SECOND OPINION ON |
| | BUILDING EXPOSURE FOR THIS BUILDING. HE AGREES ON |
| | EXPOSURE "D". PROPERTY APPRAISAL AERIAL VIEWS WILL BE |
| | E-MAILED TO ARCHITECT TO ILLUSTRATE BUILDING EXPOSURE). |
| | |
| | 2- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR THE |
| | OPENING PROTECTION OF WINDOW LOCATED BETWEEN GARAGE AND |
| | OFFICE. SEC. R302.5 OF 2010 FBC-RESIDENTIAL. (COMPLETE |
| | ASSEMBLY MAY BE SUBMITTED LATER FOR BUILDING OFFICIAL |
| | REVIEW AND APPROVAL) |
| | |
| | 3- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | DCA RULE 9N-3 FOR (NOTE: ALL PRODUCT APPROVALS WILL BE |
| | RE-REVIEWED WHEN DESIGN PRESSURES ARE CHANGED FOR |
| | EXPOSURE "D"): |
| | A) CUSTOM MADE ENTRY DOOR ASSEMBLY. NEED TO PROVIDE |
| | COMPLETE ENGINEER PACKAGE FOR SITE SPECIFIC APPROVAL. |
| | MANUFACTURER TO CONTACT ROBERT BROWN (BUILDING |
| | OFFICIAL) AT (561)805-6652 OR AT [email protected] TO |
| | COORDINATE REQUIRED SUBMITTAL PACKAGE TO AVOID DELAYS |
| | OR CONFLICTS. |
| | |
| | B) FIXED WINDOW SIZE SPECIFIED FOR WINDOW "F" ON THE |
| | WINDOW SCHEDULE. NOA 11-1031.06 SUBMITTED DOESN'T COVER |
| | THAT SIZE. |
| | NOTE: WINDOW SCHEDULE CALLS FOR PGT WINDOWS. PRODUCT |
| | APPROVALS SUBMITTED ARE FOR DIFFERENT MANUFACTURER. |
| | REVISE AS REQUIRED. |
| | |
| | C) OUTSWING GLAZED DOOR WITH SIDELITES: NEED TO PROVIDE |
| | PRODUCT APPROVAL THAT COVERS SIZE FOR DOOR #4. |
| | |
| | D) SLIDING GLASS DOORS WITH 3 PANELS SIZE AS SPECIFIED |
| | FOR DOOR #3. |
| | |
| | E) PRECAST LINTELS AS SPECIFIED ON PLANS. NOA |
| | 13-0321.07 SUBMITTED IS FOR 4", 6" & 12" LINTELS. THIS |
| | IS NOT WHAT'S SPECIFIED ON PLANS. |
| | |
| | 4- DESIGNER OF RECORD TO REVIEW AND APPROVE ABOVE |
| | PRODUCT APPROVALS. SEC. 107.3.4.1 CITY AMENDMENTS. |
| | |
| | 5- GEO-TECHNICAL ENGINEERING REPORT SUBMITTED NEED THE |
| | ENGINEER'S ORIGINAL SEAL AND SIGNATURE AS REQUIRED BY |
| | CHAPTER 471 F.S. |
| | |
| | NOTE: FLOOD ZONE A5. ELEVATION CERTIFICATES WILL BE |
| | REQUIRED DURING CONSTRUCTION. |
| | |
| | ***PLEASE PROVIDE A RESPONSE LETTER ADDRESSING EACH |
| | COMMENT TO EXPEDITE THE REVIEW PROCESS. |
| | ***PLEASE REPLACE AND REMOVE ANY REVISED DRAWING. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | (561)805-6712 |
| | [email protected] |