| Date |
Text |
| 2015-04-02 04:03:43 | 1) THE ADDITIONAL INFORMATION PROVIDED HAS RAISED |
| | ADDITIONAL QUESTIONS: IT APPEARS FROM THE DRAWING THAT |
| | THE LINE FOR THE FIREPIT IS COMING FROM AN EXISTING |
| | FIREPLACE.HOW MANY MORE GAS FIXTURES ARE ON THIS LINE? |
| | SUBMIT THE TOTAL BTU LOAD FOR ALL THE GAS FIXTURES ON |
| | THIS PE LINE.DOES THIS PE LINE CONTINUE TO THE GAS |
| | METER? IF SO SUBMIT THE TOTAL LENGTH OF THIS LINE FROM |
| | THE METER TO THE FIRE PIT AND TO THE MOST REMOTE GAS |
| | FIXTURE AND INCLUDE THE TOTAL BTU LOAD ON THIS LINE. |
| | DOES THIS LINE FOR THE FIREPLACE AND FIRE PIT GO BACK |
| | TO THE METER WITH NO OTHER FIXTURES ON IT. THE PLAN IS |
| | VAGUE? WPB AMEND. TO 2010 FGC SEC.107.2.1. |
| | 2) THE DRAWING SHOWS "UP WALL". CLARIFY. WHAT TYPE OF |
| | PIPE IS GOING UP THE WALL. WHAT IS THE LENGTH OF THIS |
| | PIPE? THE DRAWING IS VAGUE.WPB AMEND. TO 2010 FBC |
| | SEC.107.2.1. |
| | 3) THE PLAN STATES THAT THIS IS A 2 PSI SYSTEM YET THE |
| | GAS TABLE YOU REFERENCE IS FOR LESS THAN 2 PSI. WHICH |
| | IS IT? |
| | 4) SUBMIT TWO COPIES OF THE MANUF. SPECS.FOR THE FIRE |
| | PIT. THE APPLIANCE MUST BE LISTED AND LABELED PER THE |
| | 2010 FGC SEC. 301.3.WHAT YOU HAVE SUBMITTED ARE NOT |
| | MANUF. SPECIFICATIONS, IT IS A SALES PAGE FROM THE |
| | INTERNET.PLEASE REFER TO 2010 FGC SEC. 202 FOR THE |
| | DEFINITION OF "LABELED". & "LISTED". |
| | 5) I SUGGEST YOU CALL TO SET UP AN APPOINTMENT TO GO |
| | OVER THESE COMMENTS SO I CAN CLEARLY EXPLAIN WHAT IS |
| | REQUIRED TO ISSUE THIS PERMIT. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |