| Date |
Text |
| 2015-04-22 12:57:19 | 1) SHT. P2.2 - SHOWS A DRAIN LINE INSTALLED ABOVE THE |
| | CEILING. INDICATE THE TYPE OF PIPING TO BE USED. |
| | INDICATE ON THE PLAN IF THE AREA ABOVE THE CELING IS A |
| | PLENUM. IF IT IS, MATERIALS SHALL COMPLY WITH 2010 FMC |
| | SEC.602.2.1. |
| | 2) SUBMITMANUFACTURER'S SPECIFICATIONS FOR THE GREASE |
| | TRAP. SUBMIT SIZING CALCULATIONS PER 2010 FPC |
| | SEC.1003.2, 1003.3.4, 1003.4.1. |
| | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE LITTLE |
| | GIANT DRAINASAUR PUMP. WPB AMND. TO 2010 FPC SEC. |
| | 107.2.1. |
| | 4) THE EJECTOR SHALL CONNECT TO THE THE DRAINAGE SYSTEM |
| | IN ACCORDANCE WITH 2010 FPC SEC.712.3.5. |
| | 5) SHT. P2.2 - SHOWS A KEYNOTE SYMBOL #6 AT A FLOOR |
| | SINK NEXT TO THE GREASE TRAP YET THERE IS NO KEYNOTE #6 |
| | IN THE PLANS. CLARIFY. |
| | 6) THE WATER SUPPLY TO THE COFFEE MACHINE SHALL BE |
| | PROTECTED AGAINST BACKFLOW PER 2010 FPC SEC.608.16.10. |
| | 7) SUBMIT MANUFACTURER'S SPECIFICATIONS ON THE WATER |
| | SOFTENER AND WATER FILTRATION SYSTEM. SUBMIT PIPING |
| | DETAILS.WPB AMEND. TO 2010 FBC SEC. 107.2.1. |
| | 8) THE SINKS IN ROOMS # 1445 & # 1422 SHALL COMPLY WITH |
| | THE 2010 FAC SECS. 212 & 606. THE MAXIMUM HEIGHT OF THE |
| | COUNTER SHALL BE 34 INCHES AND A CLEAR FLOOR SPACE |
| | SHALL BE PROVIDED PER THE FAC SEC.606.2. |
| | 9) IDENTIFY THE ROOM WITH THE SINK THAT IS ADJACENT TO |
| | ROOM # 1418. THE SINK IN THIS ROOM MAY HAVE TO COMPLY |
| | WITH THE FAC SECS.212 & 606. |
| | 10) SHT. P5.1 - THE FOLLOWING PLUMBING VIOLATIONS |
| | EXIST: |
| | 1) THE LAVATORIES IN THE MEN'S AND WOMEN'S RESTROOM DO |
| | NOT APPEAR TO BE VENTED AND APPEAR TO BE DRAWN AS "S" |
| | TRAPS. 2010 FPC SEC.901.1.1, 1002.3. CLARIFY. |
| | 2) URINALS APPEAR TO BE "S" TRAPPED AS DRAWN. CLARIFY. |
| | 3) THE DESIGN OF THE PLUMBING SYSTEM FOR THE MEN'S AND |
| | WOMEN'S RESTROOM DOES NOT COMPLY WITH THE PLUMBING CODE |
| | FOR A WET VENT SYSTEM OR A CIRCUIT SYSTEM (FPC 909 & |
| | 911). |
| | 4) SK-3 IN EXECUTIVE PREP AREA IS S-TRAPPED ON THE |
| | RISER. 2010 FPC SEC.901.1.1, 1002.3. CLARIFY. |
| | 5) SIZE ALL SECTIONS OF THE VENTING SYSTEM FOR THE NEW |
| | PLUMBING FIXTURES ( LAVS, JANITOR SINK, ETC.) |
| | 6) THE WASHING MACHINE SALL DISCHARGE INTO A 3" STACK |
| | PER THE 2010 FPC SEC.406.3. |
| | 7) THE FLOOR DRAIN COLLECTING THE PAN DRAINS IS NOT |
| | CONNECTED TO ANYTHING ON THE RISER. CLARIFY. |
| | 11) IF THERE ARE GAS APPLIANCES IN THE EXECUTIVE PREP |
| | AREA, SUBMIT MANUF. SPECIFICATION SHEETS FOR ALL GAS |
| | EQUIPMENT AND SUBMIT A GAS RISER FOR REVIEW. WPB AMEND. |
| | TO 2010 FBC SEC. 107.2.1. |
| | |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |