| Date |
Text |
| 2015-05-06 14:18:58 | 1) SHT. PM2 - GAS RISER - THE DRYERS ARE SHOWN AS 96 |
| | CFH EACH BUT IN THE GAS LOAD TABLE THEY ARE SHOWN AS 90 |
| | MBH.CLARIFY. |
| | 2) THE TOTAL CFH/MBH LOAD ON THE SYSTEM THAT I |
| | CALCULATED IS 1,547 CFH.YOU HAVE CLCULATED 1469 MBH. |
| | PLEASE RE-CHECK YOUR CALCULATIONS. |
| | 3) THERE ARE 7 DIFFERENT CFH LOADS ON THE GAS RISER |
| | DIAGRAM WHERE THERE ARE NO INCREASES IN THE NUMBER OF |
| | APPLIANCES. CLARIFY. |
| | 4) THE GAS SIZING TABLES YOU HAVE LISTED (A2-2, 2-4, |
| | 5-1, 5-2, & 3-4) ARE NOT LISTED IN THE 2010 FBC-FUEL |
| | GAS CODE. HOW CAN 5 DIFFERENT SIZING TABLES BE UTILIZED |
| | FOR ONE TYPE OF PIPING MATERIAL AT A SET DEVELOPED |
| | LENGTH? CLARIFY. THE SYSTEM SHALL BE SIZED PER THE |
| | SIZING TABLES IN CHAPTER 4 OF THE 2010 FBC-FUEL GAS |
| | CODE. |
| | 5) THE PLAN SHOWS THE PIPING MATERIAL AS COPPER. COPPER |
| | SHALL NOT BE USED IF THE GAS CONTAINS MORE THAN AN |
| | AVERAGE OF 0..3 GRAINS OF HYDROGEN SULFIDE PER 100 |
| | STANDARD CUBIC FEET OF GAS PER THE 2010 FGC |
| | SEC.403.4.3, 403.5.2. SINCE THIS IS A SAFETY ISSUE |
| | DOCUMENTATION FROM FLORIDA PUBLIC UTILITIES WILL BE |
| | REQUIRED STATING THE CONTENT OF HYDROGEN SULFIDE IN |
| | THEIR LINES. |
| | 6) EXPLAIN HOW THE CALCULATIONS FOR THE REQUIRED |
| | COMBUSTION AIR WERE DONE. I DO NOT UNDERSTAND YOUR |
| | CALCULATIONS. THE RESULTING VALUE IS 16.29 OF WHAT? |
| | NOTHING IS IDENTIFIED. CLARIFY.THESE CALCULATIONS DO |
| | NOT APPEAR TO COMPLY WITH CHAPTER 304 OF THE 2010 |
| | FGC.SEE THE MANUF. SPECS FOR THE DRYER FOR THE MIN. |
| | REQD. MAKE-UP AIR. |
| | 7) THE PLANS STATE THAT THE VENTS SHALL BE A MIN. OF 28 |
| | GAUGE.ARE THESE SINGLE WALL VENTS? IF SO, THE MINIMUM |
| | THICKNESS SHALL GALVANIZED SHEET STEEL NOT LESS THAN |
| | 0.0304 INCH THICK. INDICATE THE THICKNESS OF THE 28 |
| | GAUGE VENT PIPE PER THE 2010 FGC SEC.503.7. |
| | 8) INDICATE ON THE PLANS IF THE DRYERS WILL BE |
| | INDIVIDUALLY VENTED THROUGH THE ROOF OR INTERCONNECTED |
| | WITH OTHER DRYERS.THE MANUF. SPECS RECCOMMEND |
| | INDIVIDUAL VENTING.IF THE FLUES ARE INTERCONNECTED, |
| | THEN THE VENTING SHALL COMPLY WITH THE VENTING TABLES |
| | IN CHAPT. 304 OF THE 2010 FGC. |
| | |
| | I SUGGEST THE DESIGN PROFESSIONAL CONTACT ME TO SET UP |
| | AN APPOINTMENT TO REVIEW MY PLAN REVIEW COMMENTS. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |