| Plan Review Notes For Permit 15030793 |
| Permit Number |
15030793 |
|
| Review Stop |
M |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2015-06-12 10:45:30 | 2ND REVIEW: FBC 2010 MECHANICAL | | | | | | 1) SHEET M-1: PROVIDE A DETAIL TO CLARIFY HOW THE 18 | | | X12 DUCT IS RUNNING FROM THE AHU DOWN TO THE FIRST | | | FLOOR. | | | 2) M-1: SHOW THE DUCT RUN AND DUCT SIZE FROM THE MAIN | | | DUCT TO THE BATHROOM ON THE SECOND FLOOR, AND INDICATE | | | CFM SUPPLY AIR AT THE DIFFUSER. | | | 3) THE ENERGY CALCULATION FORM 405-10 MUST BE SIGNED | | | AND DATED BY THE PREPARER AND BY THE OWNER. | | | 4) M-1: THE SEER OF THE PROPOSED UNIT IS NOT INDICATED | | | IN THE AC SCHEDULE- IT IS LISTED AS 16 SEER IN THE | | | ENERGY CALCS. | | | | | | CHRISTOPHER COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|