| Plan Review Notes For Permit 15030482 |
| Permit Number |
15030482 |
|
| Review Stop |
B |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2015-06-26 15:15:57 | BUILDING REVIEW APPROVED WITH PROVISO: | | | 1-REVISE ENERGY CALCULATIONS: (1)THERE ARE 2 TYPES OF | | | ROOFING MATERIALS. (2) WHERE IS THE INSULATED DOOR | | | SHOWN ON PAGE 3 OF 6?. (3) WINDOWS S.F. ON PAGE 3 OF 6 | | | DOESN'T MATCH PLANS. ALSO, SEE SEC. 405.5.3 FOR DOORS | | | WITH GLAZING AND REVISE AS REQUIRED. (4) REVISE WINDOWS | | | OVERHANG DEPTH AND SEPARATION TO MATCH PLANS. | | | ***IMPORTANT: WINDOWS & DOORS NEED LABEL SHOWING THE | | | U-FACTOR AND SHGC FACTOR SHOWN ON ITEM #7. | | | 2- PROVIDE ACTUAL WINDOW SIZES AND MANUFACTURER'S SPECS | | | SHOWING COMPLIANCE WITH ALL THE EGRESS REQUIREMENTS FOR | | | 1ST & 2ND FLOOR WINDOWS. | | | 3- DOOR STRUCTURAL BUCK DETAIL. NEED TO PROVIDE FULL | | | SUPPORT TO THE DOOR FRAME. | | | 4- PROVIDE CURRENT ICC EVALUATION REPORT FOR THE FOAM | | | INSULATION. | | | 5- SPECIFY SIZE OF WINDOW MULLION TO VERIFY DESIGN | | | PRESSURES. | | | 6 FLAT ROOF NOA 14-0224.03 SUBMITTED: CLEARLY IDENTIFY | | | APPROVED ASSEMBLY AND PROVIDE SIGNED & SEALED RAS 117 | | | CALCULATIONS. |
|