| 2015-04-27 18:12:25 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC 2010 |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY MECHANICAL |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE ENERGY FORM IS MISSING THE FOLLOWING |
| | INFORMATION: OWNER, BUILDER NAME, PERMIT OFFICE ( CITY |
| | OF WEST PALM BEACH ), JURISDICTION ( 604700 ). FBC |
| | 107.2.1.4 |
| | |
| | 2) THE ENERGY CALCULATIONS APPEAR TO HAVE USED AN |
| | INCORRECT ORIENTATION FOR THE AVANTI MODEL ON LOT 7. |
| | THE 3080 FRONT DOOR DOOR FACES NORTH NOT EAST AND THE |
| | 8' X 8' SGD ( 64 SQFT ) FACES WEST NOT NORTH. |
| | |
| | 3) THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR THE |
| | FRONT DOOR IS FOR A GLAZED SINGLE FRENCH DOOR WHERE THE |
| | GLASS AREA IS EQUAL OR GREATER THAN ONE THIRD OF THE |
| | DOOR AREA. THIS DOOR IS REQUIRED TO BE INCLUDED IN THE |
| | GLAZING CALCULATION AS A TOTAL FENESTRATION. FBC ENERGY |
| | SECTION 405.5.3 |
| | |
| | 4) ON THE MECHANICAL PLANS FOR THE MADERA AND CASSANDRA |
| | MODELS THE 14" RETURN TRANSFER DUCT IS TOO SMALL FOR |
| | THE MASTER BEDROOM SUITE. THERE ARE (2) 5", (1) 4" AND |
| | (1) 8" SUPPLY DUCTS ENTERING THE MASTER SUITE WITH A |
| | TOTAL CROSS SECTIONAL AREA OF 103". FBC-R M1602.4 |
| | REQUIRES THE TRANSFER DUCT TO BE 1.5 TIMES THE CROSS |
| | SECTIONAL AREA OF THE SUPPLY DUCTS ENTERING THE SUITE |
| | AND A ONE INCH UNDERCUT OF THE DOOR. |
| | |
| | 5) THE END UNITS TYPICALLY REQUIRE LARGER HEATING AND |
| | COOLING LOADS THAN THE UNITS IN BETWEEN. THEY HAVE AN |
| | EXTRA EXTERIOR WALL WITH WINDOWS. REVIEW THE |
| | CALCULATIONS TO DETERMINE WHY ALL OF THE UNITS HAVE THE |
| | SAME LOADS. FBC 107.2.1 |
| | |
| | |