| 2015-07-06 19:27:53 | PLAN REVIEW COMMENTS |
| | 3RD REVIEW: FBC 2010 |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING - ( NOTE: THE PERMIT APPLICATION IS |
| | MISSING FROM THE CONSTRUCTION DOCUMENTS. A NEW |
| | REPLACEMENT APPLICATION IS REQUIRED. ) |
| | |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) REPEAT COMMENT. THE PLANS SPECIFY NEW IMPACT RATED |
| | DOORS AND WINDOWS. FBC 107.3.4 - PROVIDE TWO SETS OF |
| | PRODUCT APPROVALS FOR THOSE PRODUCTS WHICH ARE |
| | REGULATED BY DCA RULE 9N-3 THAT HAVE BEEN REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD. PROVIDE |
| | TWO COMPLETE PRODUCT APPROVALS WITH FL OR NOA NUMBERS |
| | INCLUDING INSTALLATION INSTRUCTIONS AND MAXIMUM DESIGN |
| | PRESSURES FOR EACH OF THE WINDOW AND EXTERIOR DOOR |
| | TYPES. ONLY ONE SET OF PRODUCT APPROVALS WAS SUBMITTED |
| | AND TWO SETS ARE REQUIRED. |
| | |
| | 2)THE PRODUCT APPROVALS THAT WERE SUBMITTED ARE FOR |
| | NON-IMPACT RATED WINDOWS AND GLAZED EXTERIOR DOORS. |
| | SUBMIT PRODUCT APPROVALS FOR THE REQUIRED IMPACT |
| | PROTECTION DEVICES. FBC-R301.2.1.2 |
| | |
| | 3) SUBMIT TWO COPIES OF A KEY PLAN AND INSTALLATION |
| | SCHEDULE FOR THE STORM PANELS. FBC 107.2.1 & |
| | FBC-R301.2.1 |
| | |
| | 4) FBC-R310.4 REQUIRES AT LEAST ONE MEANS OF ESCAPE TO |
| | BE PROVIDED WHILE STORM PANELS ARE IN PLACE DURING THE |
| | THREAT OF A STORM. OCCUPANTS IN ANY PART OF THE |
| | DWELLING SHALL BE ABLE TO ACCESS THE MEANS OF ESCAPE |
| | WITHOUT PASSING THROUGH A LOCKABLE DOOR NOT UNDER THEIR |
| | CONTROL. SHOW COMPLIANCE. |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |