| Plan Review Notes For Permit 15030095 |
| Permit Number |
15030095 |
|
| Review Stop |
ENG |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-04-06 13:27:29 | SABRE INDUSTRIES AUGER PILE DESIGN SHOWS A DEPTH OF 73 | | | FT. SHEET C-2 SHOWS THE PILE LOCATIONS IN RELATION TO | | | THE CONCRETE PIPE. BOTH DRAWINGS WILL BE ADDED TO THE | | | PERMIT FILE. | | 2015-04-01 15:52:27 | WHAT IMPACT WILL THE PROPOSED FOUNDATIONS HAVE ON THE | | | EXISTING 24-INCH CONCRETE DRAINAGE PIPE? BOTH THE | | | BUILDING AND TOWER ARE PROPOSED TO BE CONSTRUCTED OVER | | | THE EXISTING PIPE. HOW WILL THE DRAINAGE PIPE BE | | | ACCESSED FOR FUTURE MAINTENANCE? | | | | | | KELLY CRANFORD, PE | | | CITY LAND DEVELOPMENT ENGINEER | | | [email protected] | | | 561-494-1098 (OFFICE) | | | |
|