| Date |
Text |
| 2015-04-06 17:05:58 | FAILED |
| | |
| | 1) THE PALM BEACH DAY ACADEMY COMMUNITY SERVICE PLANNED |
| | DEVELOPMENT IS GOVERNED BY DEVELOPMENT REGULATIONS |
| | STATED IN RESOLUTION NO. 144-11. THE ABANDONMENT AND |
| | REDEDICATION OF THE INTERSECTION OF TUXEDO AND COCOANUT |
| | LANES AND THE ABANDONMENT OF A PORTION OF ORANGE COURT |
| | ARE GOVERNED BY RESOLUTION NOS. 341-10 AND 342-10, |
| | RESPECTIVELY. |
| | |
| | 2) PROVIDE VERIFICATION THAT THE DEVELOPMENT CONDITIONS |
| | FROM RESOLUTION NO. 144-11 LISTED BELOW HAVE BEEN |
| | SATISFIED: |
| | |
| | A. GRANT TO THE CITY A TEMPORARY ACCESS EASEMENT FOR |
| | USE OF TUXEDO AND COCONUT LANES UNTIL THE ROADS ARE |
| | RELOCATED; EXISTING UTILITIES UNTIL RELOCATED; AND |
| | EXISTING DRAINAGE UNTIL RELOCATED, IN FORM ACCEPTABLE |
| | TO THE CITY. |
| | |
| | B. GRANT TO THE CITY A DRAINAGE AND FLOWAGE EASEMENT |
| | FOR ALL ON-SITE DRAINAGE AND FLOWAGE THROUGH THE |
| | BIOSWALE [OR CURRENT ITERATION]. PBDA SHALL BE |
| | RESPONSIBLE FOR MAINTENANCE OF ALL ON-SITE DRAINAGE. |
| | |
| | C. PROVIDE THE PLANNING DIVISION WITH A TRAFFIC CONTROL |
| | PLAN, APPROVED BY THE CITY'S TRAFFIC ENGINEER, WHICH |
| | INCLUDES THE LOCATIONS OF THE TRAFFIC DIRECTING |
| | PERSONNEL AND A WRITTEN NARRATIVE HOW THE TRAFFIC |
| | CONTROL OPERATIONS WILL FUNCTION FOR THE PICK-UP AND |
| | DROP-OFF TIMES. THE COST TO CONSTRUCT, INSTALL AND |
| | MAINTAIN ANY OFF-SITE SIGNAGE OR TRAFFIC CONTROL AIDES |
| | SHALL BE BORNE BY THE PBDA. |
| | |
| | D. PREPARE A CONSTRUCTION SITE SECURITY AND MANAGEMENT |
| | PLAN FOR APPROVAL BY THE CITY'S POLICE DEPARTMENT CRIME |
| | PREVENTION THROUGH ENVIRONMENTAL DESIGN (CPTED) |
| | OFFICIAL. |
| | |
| | I. THE APPLICANT, AFTER SITE CLEARING AND PLACEMENT OF |
| | CONSTRUCTION TRAILERS, SHALL INSTITUTE SECURITY |
| | MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES FOR |
| | THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT BE |
| | LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, |
| | VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, |
| | REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE |
| | SUBCONTRACTORS TO SECURE MACHINERY AND TOOLS AT END OF |
| | WORK DAY, FENCING WITH SCREENING, AND/OR ANY OTHER |
| | MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE |
| | WORKING ENVIRONMENT. |
| | |
| | II. THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED |
| | THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. |
| | NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A |
| | STOP-WORK ORDER FOR THE ENTIRE PLANNED DEVELOPMENT. |
| | |
| | III. "NO TRESPASSING" SIGNS SHALL BE POSTED EVERY 500 |
| | FEET AROUND THE PERIMETER OF THE CONSTRUCTION SITE. |
| | |
| | E. RECORD A PLAT FOR THE ENTIRE PBDA CAMPUS. PRIOR TO |
| | RECORDATION, THE PLAT SHALL BE SUBMITTED FOR REVIEW |
| | THROUGH THE MINOR SUBDIVISION PROCESS TO INCLUDE ALL |
| | REQUIRED EASEMENTS. THE RELOCATION AND/OR ABANDONMENT |
| | OF EASEMENTS WILL REQUIRE APPLICATIONS TO BE FILED WITH |
| | THE ENGINEERING SERVICES DIVISION. |
| | |
| | F. SUBMIT COMPREHENSIVE EMERGENCY PLANS TO THE FIRE |
| | DEPARTMENT FOR THEIR APPROVAL. |
| | |
| | G. SUBMIT TO THE ENGINEERING SERVICES DIVISION SIGNED |
| | AND SEALED ENGINEERING CALCULATIONS TO DEMONSTRATE THAT |
| | WATER QUALITY IS BEING MAINTAINED FOR THE SITE AND THAT |
| | POST DEVELOPMENT OFF-SITE DISCHARGE DOES NOT EXCEED THE |
| | PREDEVELOPMENT OFF-SITE DISCHARGE. |
| | |
| | H. THE PBDA SHALL PROVIDE A TEMPORARY ACCESS, UTILITY |
| | AND DRAINAGE EASEMENT, APPROVED BY THE ENGINEERING |
| | SERVICES DEPARTMENT, IN FAVOR OF THE CITY AT THE TIME |
| | OF THE RECORDATION OF THE PBDA PLAT. |
| | |
| | 3) IN ACCORDANCE WITH THE TPS APPROVAL LETTER FOR THE |
| | PALM BEACH DAY ACADEMY CSPD, NO BUILDING PERMIT FOR NEW |
| | DEVELOPMENT WITHIN THE PALM BEACH DAY ACADEMY CSPD WILL |
| | BE ISSUED AFTER THE BUILD-OUT DATE OF DECEMBER 31, |
| | 2014, UNLESS THE PALM BEACH COUNTY TRAFFIC DIVISION |
| | ISSUES AN AMENDED TRAFFIC CONCURRENCY LETTER WITH A NEW |
| | BUILD-OUT DATE. IN THE EVENT THAT THE PALM BEACH COUNTY |
| | TRAFFIC DIVISION ISSUES A REVISED TRAFFIC CONCURRENCY |
| | LETTER, THEN THE BUILD-OUT DATE IN THIS CONDITION SHALL |
| | BE AMENDED THROUGH THE MINOR AMENDMENT PROCESS. |
| | |
| | 4) PROVIDE VERIFICATION THAT THE FOLLOWING CONDITIONS |
| | OUTLINED IN RESOLUTION NO. 341-10 HAVE BEEN MET: |
| | |
| | A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE |
| | ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY |
| | ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND |
| | ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH |
| | THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL |
| | THROUGH AN APPLICATION SUBMITTED TO THE CITY'S |
| | ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS |
| | SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE |
| | INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. |
| | |
| | B. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER |
| | AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM |
| | BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY |
| | EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE |
| | CAMPUS. |
| | |
| | C. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION |
| | TO THE ENGINEERING SERVICES DEPARTMENT FOR THE |
| | REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE |
| | RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING |
| | SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY |
| | ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE |
| | INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE |
| | ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED |
| | RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A |
| | BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED |
| | COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND |
| | THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM |
| | BEACH DAY ACADEMY PLAT. |
| | |
| | D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY A |
| | TEMPORARY ACCESS EASEMENT, AND TEMPORARY UTILITIES AND |
| | DRAINAGE EASEMENTS OVER AND ACROSS THE ABANDONED |
| | RIGHT-OF-WAY, IN FORM APPROVED BY THE OFFICE OF THE |
| | CITY ATTORNEY, AT THE TIME OF THE RECORDATION OF THE |
| | PALM BEACH DAY ACADEMY PLAT. |
| | |
| | E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER |
| | $11,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF |
| | THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. |
| | |
| | 5) PROVIDE VERIFICATION THAT THE FOLLOWING CONDITIONS |
| | OUTLINED IN RESOLUTION NO. 342-10 HAVE BEEN MET: |
| | |
| | A. PALM BEACH DAY ACADEMY SHALL RECORD A PLAT FOR THE |
| | ENTIRE CAMPUS. PRIOR TO RECORDATION, THE PALM BEACH DAY |
| | ACADEMY SHALL MAKE APPLICATION TO THE PLANNING AND |
| | ZONING DEPARTMENT FOR THE REVIEW OF THE PLAT THROUGH |
| | THE MINOR SUBDIVISION PROCESS WITH FINAL PLAT APPROVAL |
| | THROUGH AN APPLICATION SUBMITTED TO THE CITY'S |
| | ENGINEERING SERVICES DEPARTMENT. ALL REQUIRED EASEMENTS |
| | SHALL BE PROVIDED EITHER BY PLAT OR SEPARATE |
| | INSTRUMENT, IN A FORM ACCEPTABLE TO THE CITY. |
| | |
| | B. PALM BEACH DAY ACADEMY SHALL SUBMIT AN APPLICATION |
| | TO THE ENGINEERING SERVICES DEPARTMENT FOR THE |
| | REALIGNMENT OF THE TUXEDO AND COCOANUT LANES AND THE |
| | RELOCATION OF ANY CITY UTILITIES. AFTER THE ENGINEERING |
| | SERVICES DEPARTMENT APPROVAL, THE PALM BEACH DAY |
| | ACADEMY SHALL, AT ITS OWN COST AND EXPENSE, REALIGN THE |
| | INTERSECTION OF TUXEDO AND COCOANUT LANES AND RELOCATE |
| | ANY AND ALL UTILITY LINES LOCATED WITHIN THE ABANDONED |
| | RIGHT-OF-WAY. THE PALM BEACH DAY ACADEMY SHALL POST A |
| | BOND TO THE CITY IN THE AGREED AMOUNT OF THE ESTIMATED |
| | COSTS ASSOCIATED WITH THE RELOCATION OF THE ROADWAY AND |
| | THE UTILITY LINES PRIOR TO THE RECORDATION OF THE PALM |
| | BEACH DAY ACADEMY PLAT. |
| | |
| | C. IN THE EVENT THE UTILITIES ARE RELOCATED TO ANOTHER |
| | AREA OF THE PALM BEACH DAY ACADEMY CAMPUS, THE PALM |
| | BEACH DAY ACADEMY SHALL GRANT TO THE CITY A UTILITY |
| | EASEMENT OVER, UNDER AND THROUGH SUCH AREA OF THE |
| | CAMPUS. |
| | |
| | D. PALM BEACH DAY ACADEMY SHALL PROVIDE TO THE CITY |
| | TEMPORARY UTILITIES AND DRAINAGE EASEMENTS OVER AND |
| | ACROSS THE ABANDONED RIGHT-OF-WAY, IN FORM APPROVED BY |
| | THE CITY ATTORNEY'S OFFICE, AT THE TIME OF THE |
| | RECORDATION OF THE PALM BEACH DAY ACADEMY PLAT. |
| | |
| | E. PALM BEACH DAY ACADEMY SHALL TENDER AND DELIVER |
| | $24,000 TO THE CITY AS COMPENSATION FOR THE VALUE OF |
| | THE RIGHT-OF-WAY AND ASSOCIATED DEVELOPMENT RIGHTS. |
| | |
| | 6) ZONING STAFF UNDERSTANDS THAT THERE WILL BE CHANGES |
| | TO THE BUILDING AND SITE SUBMITTED IN THE NEAR FUTURE. |
| | IN LIGHT OF THE CONDITIONS LISTED ABOVE THAT HAVE NOT |
| | BEEN ADDRESSED, ZONING STAFF WILL NOT REVIEW THE |
| | SUBMITTED BUILDING PLANS UNTIL THE AMENDMENT HAS BEEN |
| | REVIEWED AND APPROVED. |
| | |
| | 7) A RIGHT-OF-WAY PERMIT IS REQUIRED FOR THE WORK |
| | WITHIN FLAGLER DRIVE, TUXEDO LANE AND COCOANUT LANE. |
| | |
| | 8) SEPARATE PERMITS, WITH PLANS, WILL BE REQUIRED FOR: |
| | |
| | A. LANDSCAPE |
| | B. AWNINGS AND CANOPIES |
| | C. SIGNS |
| | D. PARKING AND SIDEWALKS |
| | E. BICYCLE RACKS, BENCHES, TRASH CANS AND OTHER SITE |
| | AMENITIES |
| | F. FENCES, WALLS AND GATES |
| | G. SITE LIGHTING |
| | |
| | 9) THIS BUILDING IS SUBJECT TO THE ARTS IN PUBLIC |
| | PLACES REQUIREMENTS. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| | |
| 2015-03-10 13:48:38 | 3/10/15 |