| 2015-06-20 12:06:31 | APPROVED WITH EXCEPTION. THE PLANS HAVE BEEN APPROVED |
| | PROVISIONALLY. FAILURE TO CORRECT THE LISTED |
| | DEFICIENCIES PRIOR TO INSPECTION WILL RESULT IN FAILED |
| | INSPECTION(S) AND THE ASSESSMENT OF RE-INSPECTION |
| | FEE(S). |
| | |
| | 1) ELECTRICAL PERMIT REQUIRED. |
| | |
| | 2) THE SITE PLAN IS NOT SIIGNED OR SEALED. ALL |
| | INFORMATION, DRAWINGS, SPECIFICATIONS AND ACCOMPANYING |
| | DATA SHALL BEAR THE NAME AND SIGNATURE OF THE PERSON |
| | RESPONSIBLE FOR THE DESIGN. FBC, WPB AMENDMENTS 107.2.1 |
| | 1A) 471.025 668.001-668.006. |
| | ALL FINAL DRAWINGS, SPECIFICATIONS, PLANS, REPORTS, OR |
| | DOCUMENTS PREPARED OR ISSUED BY THE LICENSEE AND BEING |
| | FILED FOR PUBLIC RECORD AND ALL FINAL DOCUMENTS |
| | PROVIDED TO THE OWNER OR THE OWNER?S REPRESENTATIVE |
| | SHALL BE SIGNED BY THE LICENSEE, DATED, AND SEALED WITH |
| | SAID SEAL. |
| | |
| | 3) THE LOAD FROM THE ENGINEER INDICATES A 95.75 AMP |
| | LOAD ON A 100AMP SERVICE. THE ELECTRICAL CONTRACTOR |
| | ALSO SUBMITTED A LOAD CALCULATION INDICATING A 54.27AMP |
| | LOAD ON THE TRAILER AND ANOTHER 46.15AMP LOAD FOR THE |
| | JOBSITE TEMPORARY POWER PANEL. CLARIFICATION IS |
| | REQUIRED. PROVIDE A REVISED LOAD CALCULATION TO THE |
| | ELECTRICAL INSPECTOR IN THE FIELD SIGNED BY THE |
| | ENGINEER OF RECORD REVISING THE LOAD CALCULATION |
| | SUBMITTED PREVIOUSLY ON PG 2 OF 4. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |