| 2015-06-18 14:03:57 | 6/18/15 TALKED TO DONNA FIEBIG. SHE AGREED TO PASS BLDG |
| | W/ PROVISO. FEES APPLY. |
| | |
| | |
| | BUILDING REVIEW APPROVED WITH PROVISO: |
| | 1- REVISE DRAINAGE PLAN. WATER CAN'T BE DIVERTED TO THE |
| | REAR PROPERTY. |
| | 2- TYPICAL WALL SECTION: A) ROOF TILE FASTENING DOESN'T |
| | COMPLY W/ THE ROOF TILE MOMENT OF RESISTANCE (RAS 127). |
| | REVISE AS REQUIRED OR PROVIDE CALCULATIONS SHOWING |
| | COMPLIANCE. B) SPECIFY SPACING OF 4"X8" ROOF VENTS. |
| | 3- SHEET S1.00: A) SPECIFY ALL LIVE LOADS, INCLUDING |
| | THE ATTIC LIVE LOADS. SEE FOOT NOTES B AND G OF TABLE |
| | R301.5. ONLY THE DEAD LOADS WERE SPECIFIED. |
| | B) DOOR STRUCTURAL BUCK DETAIL 2X4 DOESN'T PROVIDE FULL |
| | SUPPORT TO THE DOOR FRAMING. REVISE AS REQUIRED. |
| | 4- ENERGY CALCULATIONS: A) PROVIDE ADDRESS OF JOB. B) |
| | REVISE DOOR INFORMATION ON PAGE 3 OF 6 TO-MATCH |
| | PLANS/PRODUCT APPROVALS. WHERE IS DOOR #2 ON PLANS?. |
| | C) COMPLETE THE COMPLIANCE CHECKLIST ON PAGE 6 OF 6. |
| | 5- PROVIDE PRODUCT APPROVAL (2 COPIES) FOR: A) DOUBLE |
| | ENTRY DOOR SIZE AS SHOWN ON PLANS. B) CABANA STORAGE |
| | DOOR THAT MEETS THE CALCULATED DESIGN PRESSURES. |
| | 6- ARCHITECT TO APPROVE ABOVE PRODUCT APPROVALS AND THE |
| | BAHAMAS SHUTTERS. |
| | 7- PROVIDE BAHAMA SHUTTERS COMPLETE INSTALLATION |
| | SCHEDULE. REFERENCE PRODUCT APPROVAL SUBMITTED. |
| | 8- PROVIDE COMPLETE SIGNED AND SEALED TRUSS PACKAGE AND |
| | ENGINEERED BEAMS AT TIME OF INSPECTION. |