Plan Review Notes
Plan Review Notes For Permit 15020419
Permit Number 15020419
Review Stop M
Sequence Number 4
Notes
Date Text
2015-12-10 17:06:293RD REVIEW 2014 MECHANICAL
 PERMIT #15020419
 12/10/15
  
 THE PREVIOUS (2ND) REVIEW COMMENTS WERE NOT ADDRESSED
 IN ENTIRETY, AND REVIEW OF THE REVISED PLANS AND
 SUBMITTALS HAS GENERATED SOME ADDITIONAL COMMENTS. THE
 FOLLOWING REVIEW WILL REFERENCE THE PREVIOUS (2ND)
 REVIEW COMMENTS AS THEY WERE RESPONDED TO IN THE
 NARRATIVE SUBMITTED BY THE ARCHITECT.
  
 1) COMMENT #2: THE SUBMTTED AC COOLING CALCULATIONS FOR
 THE 5TH FLOOR INDICATE A LOAD OF 1,383,300 BTU/H,
 HOWEVER THE SCHEDULE ON SHEET M0.2 INDICATES THE FIFTH
 FLOOR AIR HANDLERS AHU-5-1 AND 5-2 WILL ONLY PROVIDE
 967,500 BTU/H. PLEASE CLARIFY HOW THE COOLING DEMAND
 WILL BE MET.
 2) COMMENT #3A: TO BE CLEAR, I WAS NOT REQUESTING THAT
 THE EOR PROVIDE HIS SEAL AND SIGNATURE ON THE
 MANUFACTURER'S CUT SHEETS FOR THE COOLING TOWER.
 TYPICALLY THE EOR WILL REVIEW A PRODUCT SUBMITTAL AND
 AGREE TO IT'S USE BY PLACING A "REVIEW AND APPROVAL"
 SIGNATURE AND DATE ON THE DOCUMENT. SEE ALSO COMMENT #3
 BELOW.
 3) COMMENT #3B & 3C: IN REFERENCE TO THESE COMMENTS THE
 WPB AMENDMENTS TO THE FBC-10 BUILDING CODE HAS
 PROVISIONS FOR DEFERRED SUBMITTALS. DEFERRED SUBMITTAL:
 107.3.4.2. FOR THE PURPOSES OF THIS SECTION, DEFERRED
 SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN
 THAT ARE NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 4) COMMENT #4A: REFERENCE ITEMS #2 & 3 PRINTED ABOVE.
 5) COMMENTS #4B,C,D,E,&F: THE RESPONSE TO THESE
 COMMENTS INDICATE RE-USE OF THE EXISTING REFRIGERANT
 LEAK DETECTION AND VENTILATION SYSTEM, HOWEVER MINIMAL
 DETAILS ABOUT THE EXISITNG SYSTEM HAVE BEEN PROVIDED AS
 REQUESTED. PLEASE NOTE THAT THE PROPOSED PROJECT IS
 CLASSIFIED AS A ADDITION UNDER THE FBC-10 BUILDING
 CODES, AND THE EXSTING SYSTEM MUST BE REVIEWED TO
 VERIFY COMPLIANCE WITH THAT CODE. PLEASE PROVIDE
 COMPLETE RESPONSES AND REVISE THE PLANS ACCORDINGLY.
 6) COMMENT #4G: I WAS UNABLE TO LOCATE THE PURGE
 DISCHARGE PIPING ON SHEET M6.3. PLEASE PROVIDE A KEYED
 NOTE TO SHOW THE LOCATION.
 7) COMMENT #5: REFER TO SHEET M0.4. THE NITROUS OXIDE
 AND NITROGEN STORAGE ROOMS (32 A & 326B) EACH MUST HAVE
 8 ACH PER TABLE 7-1 ASHRAE 170-2008. PLEASE REVISE
 ACCORDINGLY.
 8) COMMENT #5: PLEASE REFER TO SECTION 2.1-8.2.2.1
 GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE
 FACILITIES. IF THE ISOLATION ROOMS ON THE FITH FLOOR
 ARE TO BE USED FOR AIRBORN INFECTION ISOLATION (AII
 ROOMS), PROVIDE PERMANENTLY INSTALLED VISUAL MECHANISMS
 THAT WILL CONSTANTLY MONITOR THE PRESSURE STATUS OF THE
 OCCUPIED ROOMS.
 9) COMMENT #5: REFER TO SECTION 7.4 ASHRAE 170-2008:
 CLASS B & C OPERATING ROOMS SHALL BE PROVIDED WITH AT
 LEAST TWO SIDEWALL RETURN OR EXHAUST GRILLS SPACED AT
 OPPOSITE CORNERS OR AS FAR APART AS POSSIBLE, WITH THE
 BOTTOM OF THESE GRILLS INSTALLED APPROXIMATELY 8 IN.
 ABOVE THE FLOOR.
 10) COMMENT #6: REFER TO ITEMS #2 & 3 ABOVE FOR
 DEFERRED SUBMITTAL REQUIREMENTS, AND ALSO NOTE WE DO
 NOT REVIEW SPEC BOOK: DEFERRED SUBMITTAL. 2010 FBC
 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE
 REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO
 SUBMITTAL FOR JURISDICTIONAL APPROVAL.
 11) COMMENT #7: REFER TO ITEMS #2 & #3 ABOVE FOR DUCT
 WORK IN THE OR ROOMS.
 12) COMMENT #8: PLEASE PROVIDE INSTALLATION DETAILS FOR
 THE FAN COIL UNITS, AND THE SAV, RAV, AND AT BOXES.
 PLEASE SEE SHEET M0.3 AND PROVIDE THE MAKE AND MODELS
 OF THE AT BOXES.
 13) COMMENT #9: AS PREVIOUSLY NOTED WE DO NOT REVIEW
 PROJECT SPEC BOOKS.
 14) COMMENT #10: PROVIDE THE PREVIOUSLY REQUESTED
 CONDENSATE DISPOSAL DETAILS INCLUDING THE PIPING RUNS
 AND DISCHARGE LOCATIONS. PLEASE NOTE THAT DETAIL 2 ON
 SHEET M8.1 SHOWS CONDENSATE DRAINING INTO A FLOOR
 DRAIN. PLEASE NOTE THAT SEC.90-126 WPB CODE OF
 ORDINANCES PROHIBITS CONDENSATE TO DRAIN INTO THE
 CITY'S SANITARY SYSTEM.
 15) COMMENT #11: CLARIFY IF THE NOA FOR THE ROOF FAN
 WILL BE SUBMITTED NOW OR AS A DEFERRED SUBMITTAL.
 16) COMMENT #12: SUBMIT SPECS FOR THE DUCT WRAP AND
 EXHAUST FANS REVIEWED BY THE THE EOR. THE SPECS MUST
 INDICATE THE COMPONENTS ARE APPROVED FOR USE IN
 HAZARDOUS EXHAUST SYSTEMS. REFER TO THE FOLLWING CODE
 SECTIONS AND SHOW COMPLIANCE: SECTION 502.8.1.1 ITEMS
 1-7, AND SECTIONS 510.6, 510.7 & 510.8 . IN ADDITION
 LEASE PROVIDE EXHAUST FAN SCHEDULES ON THE PLANS .
 17) COMMENT #18: PLEASE DARKEN OR EMBOLDEN THE OR ROOM
 NUMBERS ON SHEET M5.5A- THEY ARE NOT LEGIBLE, AND
 REVIEW THE AIR VALVE SCHEDULE ON SHEET M0.3: IT APPEARS
 THAT THE OR ROOMS UNDER "AREA SERVED" ARE LABELED
 DIFFERENTLY FOR THE RAV BOXES.
 18) COMMENT #20: REFER TO PREVIOUS NOTES ON DEFERRED
 SUBMITTALS.
 19) COMMENT #21: PLEASE PLACE A NOTE ON THE PLANS
 INDICATING TESTING AND BALANCING OF THE SYTEMS WILL BE
 PERFORMED IN ACCORDANCE WITH SECTION 503.9.1 FBC-10
 ENERGY CONSERVATION.
 18) SHEET M0.2: PLEASE INCLUDE AHU-4A IN THE EQUIPMENT
 SCHEDULE.
 19) SHEET M0.3: PLEASE INDICATE THE MAKES AND MODELS OF
 THE AIR TERMINAL BOXES.
 20) REFER TO SECTION 306.1 FBC-10 MECHANICAL AND INDATE
 HOW COMPLIANCE WILL BE MET FOR THE REQUIRED ACCESS AND
 SERVICE SPACE WILL BE PROVIDED FOR ALL OF THE AC
 EQUIPMENT AND APPLIANCES ABOVE THE CEILINGS: THE FAN
 COIL UNITS, SAV'S, RAV'S, AND AT'S. PROVIDE A TYPICAL
 ACESS PANEL DETAIL.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  