| 2015-12-10 15:42:51 | 3RD REVIEW 2014 MECHANICAL |
| | PERMIT #15020419 |
| | 12/10/15 |
| | |
| | THE PREVIOUS (2ND) REVIEW COMMENTS WERE NOT ADDRESSED |
| | IN ENTIRETY, AND REVIEW OF THE REVISED PLANS AND |
| | SUBMITTALS HAS GENERATED SOME ADDITIONAL COMMENTS. THE |
| | FOLLOWING REVIEW ITEMS 1- 17 WILL REFERENCE THE |
| | PREVIOUS (2ND) REVIEW COMMENTS AS THEY WERE RESPONDED |
| | TO IN THE NARRATIVE SUBMITTED BY THE ARCHITECT. |
| | |
| | 1) COMMENT #2: THE SUBMTTED AC COOLING CALCULATIONS FOR |
| | THE 5TH FLOOR INDICATE A LOAD OF 1,383,300 BTU/H, |
| | HOWEVER THE SCHEDULE ON SHEET M0.2 INDICATES THE FIFTH |
| | FLOOR AIR HANDLERS AHU-5-1 AND 5-2 WILL ONLY PROVIDE |
| | 967,500 BTU/H. PLEASE CLARIFY HOW THE COOLING DEMAND |
| | WILL BE MET. |
| | 2) COMMENT #3A: TO BE CLEAR, I WAS NOT REQUESTING THAT |
| | THE EOR PROVIDE HIS SEAL AND SIGNATURE ON THE |
| | MANUFACTURER'S CUT SHEETS FOR THE COOLING TOWER. |
| | TYPICALLY THE EOR WILL REVIEW A PRODUCT SUBMITTAL AND |
| | AGREE TO IT'S USE BY PLACING A "REVIEW AND APPROVAL" |
| | SIGNATURE AND DATE ON THE DOCUMENT. SEE ALSO ITEM #3 |
| | DIRECTLY BELOW. |
| | 3) COMMENT #3B & 3C: IN REFERENCE TO THESE COMMENTS THE |
| | WPB AMENDMENTS TO THE FBC-10 BUILDING CODE HAS |
| | PROVISIONS FOR DEFERRED SUBMITTALS. DEFERRED SUBMITTAL: |
| | 107.3.4.2. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| | THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | 4) COMMENT #4A: REFERENCE ITEMS #2 & 3 PRINTED ABOVE. |
| | 5) COMMENTS #4B,C,D,E,&F: THE RESPONSE TO THESE |
| | COMMENTS INDICATE RE-USE OF THE EXISTING REFRIGERANT |
| | LEAK DETECTION AND VENTILATION SYSTEM, HOWEVER MINIMAL |
| | DETAILS ABOUT THE EXISITNG SYSTEM HAVE BEEN PROVIDED AS |
| | REQUESTED. PLEASE NOTE THAT THE PROPOSED PROJECT IS |
| | CLASSIFIED AS A ADDITION UNDER THE FBC-10 BUILDING |
| | CODES, AND THE EXSTING SYSTEM MUST BE REVIEWED TO |
| | VERIFY COMPLIANCE WITH THAT CODE. PLEASE PROVIDE |
| | COMPLETE RESPONSES AND REVISE THE PLANS ACCORDINGLY. |
| | 6) COMMENT #4G: I WAS UNABLE TO LOCATE THE PURGE |
| | DISCHARGE PIPING ON SHEET M6.3. PLEASE PROVIDE A KEYED |
| | NOTE TO SHOW THE LOCATION. |
| | 7) COMMENT #5: REFER TO SHEET M0.4. THE NITROUS OXIDE |
| | AND NITROGEN STORAGE ROOMS (32 A & 326B) EACH MUST HAVE |
| | 8 ACH PER TABLE 7-1 ASHRAE 170-2008. PLEASE REVISE |
| | ACCORDINGLY. |
| | 8) COMMENT #5: PLEASE REFER TO SECTION 2.1-8.2.2.1 |
| | GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE |
| | FACILITIES. IF THE ISOLATION ROOMS ON THE FITH FLOOR |
| | ARE TO BE USED FOR AIRBORN INFECTION (AII ROOMS), |
| | PROVIDE PERMANENTLY INSTALLED VISUAL MECHANISMS THAT |
| | WILL CONSTANTLY MONITOR THE PRESSURE STATUS OF THE |
| | OCCUPIED ROOMS. |
| | 9) COMMENT #5: REFER TO SECTION 7.4 ASHRAE 170-2008: |
| | CLASS B & C OPERATING ROOMS SHALL BE PROVIDED WITH AT |
| | LEAST TWO SIDEWALL RETURN OR EXHAUST GRILLS SPACED AT |
| | OPPOSITE CORNERS OR AS FAR APART AS POSSIBLE, WITH THE |
| | BOTTOM OF THESE GRILLS INSTALLED APPROXIMATELY 8 IN. |
| | ABOVE THE FLOOR. |
| | 10) COMMENT #6: REFER TO ITEMS #2 & 3 ABOVE FOR |
| | DEFERRED SUBMITTAL REQUIREMENTS, AND ALSO NOTE WE DO |
| | NOT REVIEW SPEC BOOK: DEFERRED SUBMITTAL. 2010 FBC |
| | 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE |
| | REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO |
| | SUBMITTAL FOR JURISDICTIONAL APPROVAL. |
| | 11) COMMENT #7: REFER TO ITEMS #2 & #3 ABOVE FOR DUCT |
| | WORK IN THE OR ROOMS. |
| | 12) COMMENT #8: PLEASE PROVIDE INSTALLATION DETAILS FOR |
| | THE FAN COIL UNITS, AND THE SAV, RAV, AND AT BOXES. |
| | PLEASE SEE SHEET M0.3 AND PROVIDE THE MAKE AND MODELS |
| | OF THE AT BOXES. |
| | 13) COMMENT #9: AS PREVIOUSLY NOTED WE DO NOT REVIEW |
| | PROJECT SPEC BOOKS. |
| | 14) COMMENT #10: PROVIDE THE PREVIOUSLY REQUESTED |
| | CONDENSATE DISPOSAL DETAILS INCLUDING THE PIPING RUNS |
| | AND DISCHARGE LOCATIONS. PLEASE NOTE THAT DETAIL 2 ON |
| | SHEET M8.1 SHOWS CONDENSATE DRAINING INTO A FLOOR |
| | DRAIN. PLEASE NOTE THAT SEC.90-126 WPB CODE OF |
| | ORDINANCES PROHIBITS CONDENSATE TO DRAIN INTO THE |
| | CITY'S SANITARY SYSTEM. |
| | 15) COMMENT #11: CLARIFY IF THE NOA FOR THE ROOF FAN |
| | WILL BE SUBMITTED NOW, OR AS A DEFERRED SUBMITTAL. |
| | 16) COMMENT #12: SUBMIT SPECS FOR THE DUCT WRAP AND |
| | EXHAUST FANS REVIEWED BY THE THE EOR. THE SPECS MUST |
| | INDICATE THE COMPONENTS ARE APPROVED FOR USE IN |
| | HAZARDOUS EXHAUST SYSTEMS. REFER TO THE FOLLOWING CODE |
| | SECTIONS AND SHOW COMPLIANCE: SECTION 502.8.1.1 ITEMS |
| | 1-7, AND SECTIONS 510.6, 510.7 & 510.8 . IN ADDITION |
| | PLEASE PROVIDE EXHAUST FAN SCHEDULES ON THE PLANS . |
| | 17) COMMENT #18: PLEASE DARKEN OR EMBOLDENT THE OR ROOM |
| | NUMBERS ON SHEET M5.5A- THEY ARE NOT LEGIBLE, AND |
| | REVIEW THE AIR VALVE SCHEDULE ON SHEET M0.3: IT APPEARS |
| | THAT THE OR ROOMS UNDER "AREA SERVED" ARE LABELED |
| | DIFFERENTLY FOR THE RAV BOXES. |
| | 18) SHEET M0.2: PLEASE INCLUDE AHU-4A IN THE EQUIPMENT |
| | SCHEDULE. |
| | 19) SHEET M0.3: PLEASE INDICATE THE MAKES AND MODELS OF |
| | THE AIR TERMINAL BOXES. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |