Date Text
2015-07-22 11:17:142ND REVIEW: FBC 2010 MECHANICAL
 PERMIT #15020419
  
 THE 1ST REVIEW COMMENTS HAVE BEEN ADDRESSED HOWEVER THE
 PLANS HAVE BEEN REVIEWED A SECOND TIME TO CHECK FOR
 REQUESTED CORRECTIONS AND ADDITIONAL CODE COMPLIANCES.
 PLEASE REVISE THE PLANS IN ACCORDANCE WITH THE
 FOLLOWING LIST OF COMMENTS.
  
 1) THE SUBMITTED FLORIDA ENERGY EFFICIENCY COMPLIANCE
 FORM 506-2010 DOES NOT PROVIDE ANY COMPLIANCE DATA FOR
 THE CHILLERS, THE COOLING TOWER, AND AHU-4 & AHU-4-1.
 SEE TABLES 503.2.3 (4) 503.2.3(7) & 503.2.3(8) FBC-10
 ENERGY CONSERVATION. PLEASE REVISE ACCORDINGLY.
 2) COOLING AND HEATING EQUIPMENT SIZING CALCULATIONS
 HAVE NOT BEEN SUBMITTED- REFERENCE SECTION 503.2.1
 FBC-10 ENERGY AND PROVIDE THE CALCULATIONS IN
 ACCORDANCE WITH ASHRAE/ACCA STANDARD 183 OR ACCA MANUAL
 N.
 3) COOLING TOWER: A) SUBMIT MARLEY PRODUCT DATA AND
 DIAGRAM CUT SHEETS WITH THE ENGINEER OF RECORD'S
 APPROVAL STAMP AND SIGNATURE ON THE DOCUMENTS. B)
 PROVIDE ENGINEERED STRUCTURAL DETAILS AND WIND LOAD
 DESIGN CRITERIA FOR ATTACHMENT OF THE COOLING TOWER AND
 TOWER BASE TO THE ROOF STRUCTURE- SECTION301.12 FBC-10
 MECHANICAL. C) PROVIDE STRUCTURAL DETAILS FOR
 INSTALLATION OF THE TOWER LADDER AND GUARDRAILS. D)
 SHOW THE PHYSICAL LOCATIONS OF THE COOLING TOWER
 CHEMICAL FEED PUMPS AND CHEMICAL STORAGE DRUMS AS SHOWN
 IN THE DETAIL ON SHEET M8.1. PROVIDE ALL REQUIRED
 DETAILS FOR SECURE MOUNTING OF THE PUMP EQUIPMENT AND
 THE 55 GALLON DRUMS.
 4) CHILLERS AND ASHRAE 15 COMPLIANCE: A) SUBMIT TRANE
 MANUFACTURER'S SPECIFICATIONS SHEETS WITH THE ENGINEER
 OF RECORD'S APPROVAL STAMP AND SIGNATURE ON THE
 DOCUMENTS. B) INDICATE THE TYPE AND QUANTITY OF
 REFRIGERANT LBS. IN THE EQUIPMENT SCHEDULES FOR THE
 CHILLERS ON SHEET M0.1- SEE TABLE 1103.1 FBC-10
 MECHANICAL. C) REFER TO ASHRAE 15 AND SECTION 1105 FOR
 MECHANICAL RM 303: SHOW THE LOCATION OF THE REFRIGERANT
 LEAK DETECTOR, PROVIDE AN EQUIPMENT SCHEDULE FOR THE
 DEVICE, AND SUBMIT MANUFACTURER'S SPECIFICATIONS
 REVIEWED AND APPROVED BY THE ENGINEER OF RECORD. D)
 PROVIDE VENTILATION CALCULATIONS FOR NORMAL VENTILATION
 OF THE MECHANICAL ROOM, AND CALCULATIONS FOR EMERGENCY
 CONDITIONS, AND INDICATE COMPLIANCE. E) PROVIDE DETAILS
 FOR MAKE-UP AND EXHAUST VENTILATION AIR INCLUDING
 LOCATIONS OF AIR INLET AND EXHAUST OUTLETS, FANS
 SCHEDULES, LOUVER, CLEARANCE DISTANCES SIZES ETC. F)
 PROVIDE A SEQUENCE OF OPERATION FOR THE LEAK DETECTION
 /VENTILATION SYSTEM THAT INCLUDES A DESCRIPTIVE
 NARRATIVE OF THE PROCESS AND A DIAGRAM. G) PROVIDE
 DETAILS FOR PURGE DISCHARGE PIPING INCLUDING THE PIPING
 RUN AND DISCHARGE LOCATION- REFER TO SECTION 1105.7. H)
 SEE SHEET M7.06: CLARIFY WHY THERE IS NO DATA
 PERFORMANCE DATA LISTED IN THE DIAGRAM FOR CH-2. PLEASE
 NOTE THAT SHEET M7.06 IS IDENTIFIED INCORRECTLY IN THE
 INDEX AS "EXHAUST FAN CONTROL DIAGRAMS".
 5) SHEET M0.4 & M0.5: INDICATE ON THE PLANS WHICH
 CURRENT CODE OR DESIGN STANDARD WAS USED TO CALCULATE
 THE REQUIRED VENTILATION AND AIR BALANCES FOR ROOMS AND
 SPACES INCLUDING PRESSURIZATION CALCULATIONS FOR THE
 OR?S AND ISOLATIONS ROOMS ETC.
 6) PROVIDE EQUIPMENT SCHEDULES FOR THE AIR INTAKE AND
 EXHAUST LOUVER LISTING MAKES AND MODELS, DIMENSIONS,
 AND FREE AIR SPACE FOR EACH. PROVIDE SIZING
 CALCULATIONS FOR THE O/A INTAKES, AND SUBMIT SPECS FOR
 ALL REQUIRED AIR FILTERS REVIEWED AND APPROVED BY THE
 ENGINEER OF RECORD.
 7) PROVIDE MANUFACTURER'S SPECIFICATIONS FOR THE FLEX
 DUCTS TO BE INSTALLED REVIEWED AND APPROVED BY THE
 ENGINEER OF RECORD- REFER TO SECTION 419.3.6.4 FBC-10
 BUILDING. INDICATE THE FLEX DUCT SIZES ON THE PLANS AND
 SHOW INSTALLATION DETAILS INCLUDING A DETAIL FOR
 CONNECTION TO THE OR ROOM DIFFUSERS.
 8) PROVIDE STRUCTURAL DETAILS FOR HANGING AND SUPPORT
 OF THE AIR HANDLERS AND FAN COIL UNITS.
 9) PROVIDE CHILLED WATER AND STEAM PIPE SPECIFICATIONS
 AND DETAILS FOR INSTALLATION AND SUPPORT.
 10) PROVIDE DETAILS FOR CONDENSATE DISPOSAL FROM THE
 AIR HANDLERS. INDICATE THE TYPES AND SIZES OF PIPING,
 THE PIPING RUNS, AND DISCHARGE LOCATIONS- SEE SECTION
 307 FBC-10 MECHANICAL. SHOW DETAILS FOR SECONDARY OR
 AUXILIARY DISPOSAL PER SECTION 307.2.3.
 11) PROVIDE WIND LOAD ENGINEERING FOR MOUNTING THE ROOF
 TOP EXHAUST FANS- SECTION 301.12. PLEASE NOTE THAT
 INLINE BOOSTER FANS FOR THE DRYERS ARE PROHIBITED BY
 THE WPB FIRE DEPT.
 12) SHEET M5.3.A, NITROUS OXIDE AND NITROGEN STORAGE
 ROOMS 326 A & B: REVISE THE PLANS WITH NOTES AND
 DETAILS TO SHOW COMPLIANCE WITH THE FOLLOWING SECTIONS
 OF NFPA 99. SECTION 9.3.6.5.3.1- CONTINUOUS
 VENTILATION, 9.3.6.5.2- RATE OF VENTILATION
 CALCULATION, 9.3.6.5.3.3- LOCATION OF EXHAUST VENT IN
 THE ROOM, AND 9.3.6.5.3.2- TYPE OF MAKE-UP AIR AND
 EXHAUST DUCTWORK, AND EXHAUST DUCT TERMINATION
 CLEARANCES. A) PLEASE NOTE THAT DAMPERS ARE REQUIRED
 FOR THE EXHAUST DUCTS PENETRATING THE FIRE RATED WALLS
 OF THE STORAGE ROOMS UNLESS THE EXHAUST SYSTEM IS
 DEFINED AS HAZARDOUS- REFER TO SECTION 510.6.1
 MECHANICAL. REVISE THE PLANS TO SHOW COMPLIANCE
 13) M5.3.A: VENTILATION IS REQUIRED FOR GENERATOR RM
 340. PLEASE PROVIDE CALCULATIONS AND DETAILS ON THE
 PLAN.
 14) M5.3.A: MISSING FIRE DAMPERS AT DUCTS PENETRATING
 THE EXHAUST SHAFT AT 321-B CORRIDOR.
 15) M5.3.A: NUMEROUS BRANCH DUCT SIZES ARE NOT SHOWN:
 PLEASE REVIEW AND REVISE.
 16) M5.4.A: MISSING FIRE DAMPER AT RETURN AIR DUCT
 PENETRATING THE FIRE RATED CORRIDOR WALL AT THE NE
 CORNER OF MECH. RM 404.
 17) M5.5.A: A) LABEL THE DAMPERS PENETRATING THE SHAFTS
 AT CORRIDOR 573. B) MANY DAMPERS MISSING FOR DUCTS
 PENETRATING RATED CORRIDOR 541 & 542 WALLS, AND THE
 SATELLITE PHARMACY WALLS.
 18) M5.5.A: THE OR ROOM NUMBERS DO NOT MATCH THE OR
 NUMBERS IN THE SCHEDULE ON SHEET M0.3.
 19) M5.5.A: THE SAV AND RAV NUMBERS ON THE PLAN DO NOT
 MATCH THE NUMBERS IN THE SCHEDULE- M0.3.
 20) REQUIRED SUBMITTALS, NOA'S AND FL. PRODUCT
 APPROVALS TO BE REVIEWED AND APPROVED BY THE ENGINEER
 OF RECORD: EXHAUST AND INTAKE LOUVERS, ROOF MOUNTED
 EXHAUST FANS, FLEX DUCTS, FIRE AND FIRE/SMOKE DAMPERS,
 DUCT SMOKE DETECTORS, REFRIGERANT LEAK DETECTORS, HEPA
 EQUIPMENT AND FILTERS.
 21) PLEASE REVIEW SECTION 503.2.9 FBC-10 ENERGY
 CONSERVATION FOR SYSTEM COMPLETION AND TESTING AND
 BALANCING- AND PROVIDE NOTES ON THE PLAN TO INDICATE
 HOW COMPLIANCE WILL BE MET.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER