| 2015-02-26 14:07:38 | 2/23/2015 |
| | PROJECT: FL DEPT OF HEALTH |
| | PERMIT#: 15020119 |
| | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC |
| | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | 1ST ELECTRICAL PLAN REVIEW |
| | ACTION: DENIED |
| | |
| | 1) SHEET E-1 |
| | NOTE 13 INDICATED ON PARTIAL 1ST FL DEMOLITION PLAN |
| | STATES EXISTING FUSE CABINET TO BE RELOCATED BY OWNER. |
| | THIS FUSE CABINET DOES NOT APPEAR ON THE NEW PLANS. |
| | WHERE IS THE NEW LOCATION?/ IS IT UNDER THIS SCOPE OR |
| | ON A FUTURE SCOPE UNDER A SEPARATE PERMIT? |
| | |
| | 2) PROVIDE MANUFACTURER DATA SHEETS ON ATS AND |
| | GENERATOR. |
| | |
| | 3) PROVIDE LOAD CALCULATION FOR MDP3 TO INDICATE |
| | AVAILABLE CAPACITY FOR INCREASED LOAD. |
| | |
| | 4) PROVIDE A DETAILED PANEL SCHEDULE AND LOAD |
| | CALCULATION FOR NEW PANEL LSI. NEC 408.4 AND 215.5 |
| | |
| | 5) SHEET E-2 |
| | PROVIDE THE SIZE OF GUTTER INDICATED IN NOTE 10 |
| | |
| | 6) INDICATE THE SIZE OF THE OCPD AT ECB-GLS. |
| | |
| | 7) PROVIDE SUPPORT DOCUMENTATION FOR PROJECT VALUATION |
| | INDICATED ON THE PERMIT APPLICATION. VALUATION SHALL |
| | INCLUDE ALL EQUIPMENT INSTALLATION COSTS OVERHEAD AND |
| | PROFFIT TO COVER THE COMPETE COST OF THE INSTALLATION |
| | FBC WPB AMENDMENTS. SECTION 109.3 |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. SEE LINK: |
| | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| | |
| | ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED |
| | PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE |
| | PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE |
| | REVIEW. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |