| Plan Review Notes For Permit 15020047 |
| Permit Number |
15020047 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-02-05 05:48:48 | 1) PLANS DONE IN PENCIL ARE NOT ACCEPTED. | | | 2) SUBMIT 2 COPIES OF MANUF. SPECIFICATIONS AND | | | INSTALLATION INSTRUCTIONS FOR ALL GAS APPLIANCES.WPB | | | AMEND. TO 2010 FBC SEC.107.2.1. | | | 3) ALL GAS APPLIANCES SHALL BE LISTED AND LABELED PER | | | 2010 FBCR SEC.G2404.3. | | | 4) SUBMIT 2 COPIES OF THE APPLICABLE PIPE SIZING TABLE | | | FROM CHAPT.24 OF THE 2010 FBCR. | | | 5) SHOW THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL | | | BTU LOAD ON THE SYSTEM.2010 FBCR SEC,G2413.1., 2413.2. | | | 6) SHOW THE DISTANCE FROM THE METER TO THE FURTHEST OUT | | | PER 2010 FBCR SEC.G2413.4.1. | | | 7) INDICATE THE GAS DELIVERY PRESSURE ON THE PLANS.WPB | | | AMEND. TO 2010 FBC SEC.107.2.1. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | 2015-02-03 09:41:05 | ROUTED TO PLUMBING |
|