| 2015-04-09 11:34:04 | REVISION APPROVED WITH PROVISO: | | | | | | 1- PROVIDE COMPLETE INSTALLATION SCHEDULE FOR THE | | | IMPACT PROTECTION SYSTEM NOA 12-1004.02 SUBMITTED. NEED | | | INSTALLATION SCHEDULE TO VERIFY COMPLIANCE WITH THE | | | DESIGN PRESSURES OF SEC. R301. 2.1.4 OF 2010 FBC. | | | NOTE: YOU MAY USE THE CITY INSTALLATION SCHEDULE SAMPLE | | | OR PROVIDE COMPLETE INFORMATION IN A DIFFERENT FORMAT | | | AS LONG AS ALL THE REQUIRED INFORMATION IS PROVIDED. | | | | | | NOTE: FOR YOUR INFORMATION LANDINGS WILL BE REQUIRED | | | FOR THE NEW EXTERIOR FRENCH DOORS. ACCORDING TO STAIR | | | DETAIL ON SHEET 5 OF ENGINEER'S DRAWINGS SUBMITTED, | | | THERE ARE THREE STEPS NOT TWO. THIS WILL BE VERIFIED IN | | | THE FIELD. | | | |
|