| Date |
Text |
| 2015-01-23 15:46:12 | 1. ALL CONSTRUCTION WASTE AND DEBRIS FROM NEW |
| | CONSTRUCTION OR MAJOR ALTERATION OR REPAIR SHALL BE |
| | KEPT IN AN ENCLOSED CONTAINER TO MINIMIZE DEBRIS FROM |
| | LITTERING ADJACENT PROPERTIES AND PUBLIC RIGHTS-OF-WAY. |
| | THE PERMITTEE, CONTRACTOR OR LANDOWNER SHALL CAUSE SUCH |
| | WASTE OR DEBRIS TO BE REMOVED WEEKLY IN ACCORDANCE WITH |
| | SECTION 74-2 OF THE CITY OF WEST PALM BEACH CODE OF |
| | ORDINANCES. |
| | 2. ALL MUD OR DEBRIS SHALL BE CONTINUALLY REMOVED FROM |
| | THE PUBLIC SIDEWALKS AND STREETS. CONSTRUCTION DEBRIS |
| | AND NEW CONSTRUCTION MATERIAL SHALL NOT BE STORED |
| | WITHIN THE RIGHT-OF-WAY. |
| | 3. CONTRACTORS, SUBCONTRACTORS, PERSONS HOLDING PERMITS |
| | TO PERFORM LAND DISTURBING CONSTRUCTION AND LAND |
| | DEVELOPMENT ACTIVITIES AND THE LANDOWNERS OF |
| | CONSTRUCTION SITES SHALL, AT THE DIRECTION OF THE |
| | ENGINEERING SERVICES DIRECTOR OR DESIGNEE, EITHER |
| | REPAIR, OR REIMBURSE THE CITY FOR ITS COSTS INCURRED TO |
| | REPAIR, ANY DAMAGE TO ANY PUBLIC RIGHT-OF-WAY THAT IS |
| | CAUSED BY ANY CONSTRUCTION VEHICLE INVOLVED IN THE LAND |
| | DISTURBING CONSTRUCTION OR LAND DEVELOPMENT ACTIVITIES. |
| | 4. REMOVAL OF PAVEMENT, DRIVES, SIDEWALK, CURBS AND |
| | GUTTERS: EDGES OF PAVEMENT SHALL BE PRE-CUT STRAIGHT, |
| | CLEAN AND SQUARE BEYOND ANY DAMAGED AREA. SIDEWALKS, |
| | CURBS OR GUTTERS SHALL BE REMOVED IN FULL SECTIONS OR A |
| | MINIMUM OF FIVE FEET IN LENGTH, AND ALL BROKEN EDGES |
| | CUT SMOOTH BY USE OF A SUITABLE POWER SAW OR OTHER |
| | APPROPRIATE MEANS. (CITY OF WEST PALM BEACH STANDARDS |
| | FOR CONSTRUCTION AND USE OF PUBLIC RIGHTS-OF-WAY AND |
| | EASEMENTS) |
| | 5. ALL CURB ELEMENTS SHALL HAVE A FOUNDATION OF ?PAD? |
| | WITH A MINIMUM LBR RATION OF 70 AND SHALL BE AT LEAST |
| | 4? IN THICKNESS, EXTENDING 6? MINIMUM BEYOND THE EDGES |
| | OF THE CONCRETE, COMPACTED TO 90% OF MAXIMUM DENSITY, |
| | PER AASHTO T-180, UNLESS OTHERWISE APPROVED. |
| | 6. SIDEWALKS AND OTHER CONCRETE WORK SHALL BE OF |
| | PORTLAND CEMENT CONCRETE, A MINIMUM OF 3,000 PSI. BATCH |
| | TICKETS ARE TO BE SUBMITTED TO THE CITY INSPECTOR AT |
| | THE TIME OF INSPECTION. |
| | |