| Date |
Text |
| 2015-03-20 11:16:16 | MECHANICAL WORK DONE WITHOUT PERMITS. NO MECHANICAL |
| | PLANS OR PERMIT APPLICATION WERE SUBMITTED. (REPEAT |
| | COMMENT) SUBMIT A MECHANICAL PERMIT APPLICATION AND TWO |
| | SETS OF PLANS THAT SPECIFY THE SCOPE OF MECHANICAL WORK |
| | THAT WAS DONE WITHOUT PERMITS. |
| | |
| | PLAN REVIEW COMMENTS |
| | |
| | 2ND REVIEW: FBC 2010 |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY MECHANICAL |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) FBC-R - M1401.3 SIZING. HEATING AND COOLING |
| | EQUIPMENT SHALL BE SIZED BASED ON BUILDING LOADS |
| | CALCULATED IN ACCORDANCE WITH ACCA MANUAL J OR OTHER |
| | APPROVED HEATING AND COOLING CALCULATION METHODOLOGIES. |
| | PROVIDE EQUIPMENT SIZING CALCULATIONS. |
| | |
| | 2) FBC - 107.3.5.3 PROVIDE A MECHANICAL PLAN TO SHOW |
| | SUPPLY AND RETURN DUCTS PER FBC-R M16 & BATH EXHAUST |
| | PER FBC-R M15. |
| | |
| | 3) FBC -107.3.5.1.4 MECHANICAL MINIMUM PLAN REVIEW |
| | CRITERIA: SHOW, EXHAUST SYSTEMS, CLOTHES DRYER EXHAUST, |
| | KITCHEN EQUIPMENT EXHAUST, SPECIALTY EXHAUST SYSTEMS, |
| | EQUIPMENT, EQUIPMENT LOCATION, MAKE-UP AIR, |
| | ROOF-MOUNTED EQUIPMENT, DUCT SYSTEMS, VENTILATION, |
| | COMBUSTION AIR, CHIMNEYS, FIREPLACES AND VENTS, |
| | APPLIANCES, BOILERS, REFRIGERATION, BATHROOM |
| | VENTILATION, LABORATORY, DESIGN FLOOD ELEVATION. |
| | |
| | 4) FBC-R - M 1602.4 PROVIDE BALANCED AIR RETURN AT |
| | BEDROOMS. |
| | |
| | 5) FBC 107.2.1 PROVIDE THE MODEL NUMBERS AND |
| | SPECIFICATIONS OF THE HEATING AND COOLING EQUIPMENT IN |
| | AN EQUIPMENT SCHEDULE ON THE MECHANICAL PLAN THAT |
| | CORRESPONDS WITH THE EQUIPMENT SIZING CALCULATIONS. |
| | |
| | 6) PLEASE BE ADVISED THE INSPECTOR MAY REQUIRE |
| | PREVIOUSLY COMPLETED WORK TO BE MADE ACCESSIBLE AND |
| | OPEN FOR INSPECTION OR REQUIRE ADDITIONAL DOCUMENTATION |
| | FOR ALL CONCEALED WORK PREVIOUSLY COMPLETED PURSUANT TO |
| | FBC 110 & FBC 117. |
| | -FBC 110.1 GENERAL. CONSTRUCTION OR WORK FOR WHICH A |
| | PERMIT IS REQUIRED SHALL BE SUBJECT TO INSPECTION BY |
| | THE BUILDING OFFICIAL AND SUCH CONSTRUCTION OR WORK |
| | SHALL REMAIN ACCESSIBLE AND EXPOSED FOR INSPECTION |
| | PURPOSES UNTIL APPROVED. |
| | -FBC 117 - THE BUILDING OFFICIAL MAY REQUIRE TESTS OR |
| | TEST REPORTS AS PROOF OF COMPLIANCE. REQUIRED TESTS ARE |
| | TO BE MADE AT THE EXPENSE OF THE OWNER, OR AGENT, BY AN |
| | APPROVED TESTING LABORATORY OR OTHER APPROVED AGENCY. |
| | |
| | 7) IN ORDER TO REDUCE PLAN REVIEW TIMES AND PROVIDE |
| | CLARIFICATION, PLEASE SUBMIT A RESPONSE LETTER |
| | INDICATING HOW EACH OF THE REVIEW COMMENTS HAS BEEN |
| | ADDRESSED. |