| 2015-08-12 06:42:50 | 1) SHT.063-AS109 - DETAIL #1 - THE MAXIMUM HEIGHT OF |
| | THE SINK CABINET SHALL BE 36 INCHES PER THE FAIR |
| | HOUSING ACT CFR 100.205 (C) (1).ONE OF THE SINKS SHALL |
| | HAVE A 30 INCH WIDE BY 48 INCH LONG CLEAR FLOOR SPACE |
| | CENTERED ON THE FIXTURE. SHOW THE REQUIRED CLEAR FLOOR |
| | SPACE ON THE PLAN. THE RESPONSE NARRATIVE WHICH REFERS |
| | TO FBC-A SEC. 233.3.1 EXCEPTION IS NOT APPLICABLE. |
| | (COMMENT # 6). |
| | 2) SHT. 262-P.003 - THE PLAN STILL SHOWS A GENERATOR |
| | BUT THE RESPONSE NARRATIVE STATES THE GENERATOR HAS |
| | BEEN REMOVED FROM THE PERMIT SET. CLARIFY.(SEE PREVIOUS |
| | REVIEW COMMENT #9). |
| | 3) SHT.074-A101 - THE SINK IN THE ART STUDIO #124 AND |
| | BREAK ROOM (#167) SHALL COMPLY WITH THE FAIR HOUSING |
| | ACT CFR 100.205 (C) (1).THE SINKS SHALL HAVE A MAXIMUM |
| | HEIGHT OF 36 INCHES AND SHALL HAVE A CLEAR FLOOR SPACE |
| | OF 30" X 48" CENTERED ON THE FIXTURE. SHOW THE REQUIRED |
| | CLEAR FLOOR SPACES ON THE PLAN. THE RESPONSE NARRATIVE |
| | WHICH REFERS TO FBC-A SEC. 233.3.1 EXCEPTION IS NOT |
| | APPLICABLE. (COMMENT#10) . |
| | 4) SHT. 146- A400 - SHOW THE MINIMUM AND MAXIMUM HEIGHT |
| | DIMENSIONS FOR THE LOCATION OF THE REINFORCEMENT FOR |
| | THE GRAB BARS. 2ND REQUEST. COMPLY WITH CFR 100.205 (6) |
| | & ANSI A117.1. (SEE PREVIOUS REVIEW COMMENT #11). |
| | 5) CLARIFY THE RESPONSE NARRATIVE TO MY PREVIOUS REVIEW |
| | COMMENT #14. THIS PROJECT CLEARLY FALLS UNDER THE FAIR |
| | HOUSING ACT YET THE RESPONSE FROM PERKINS EASTMAN |
| | STATES THE A OR B DESIGN SPECIFICATION IS NOT REQUIRED |
| | SINCE THE PROJECT MEETS FBC-A 233.3.1, EXCEPTION. |
| | 6) SHT. 168-A451 - DETAIL # 10-MEN'S & WOMEN'S |
| | RESTROOMS - BOTH OF THE AMBULATORY STALLS SHALL HAVE |
| | GRAB BARS ON NOTH SIDES OF THE STALL PER 2010 |
| | FBC-ACCESS. SEC.604.8.2.3. |
| | 7) SHT. 169-A452 -DETAIL # 020 - THERE ARE NO DETAILS |
| | FOR THE SEAT IN THE SHOWER IN THE ACCESSIBLE CHANGING |
| | ROOM. THE SEAT SHALL COMPLY WITH ANSI A117.1 -1986 |
| | SEC.4.24. |
| | 8) SHT. 185-A510 - DETAIL # 2 - SHOW THE REQUIRE KNEE & |
| | TOE CLEARANCES FOR THE SINK PER ANSI A117.1 - 1986. |
| | 9) SHT. 153-403(A) -DETAIL #2 - SHOW THE REQUIRED 30 |
| | INCHES BY 48 INCHES CLEAR FLOOR SPACE REQUIRED FOR THE |
| | SHOWER PER THE FHA GUDELINES AND CFR 100.205. |
| | 10) SHOW THE DEPTH OF THE TYPICAL LAVATORY IN THE |
| | LIVING UNITS. THE LAVATORIES SHALL NOT EXCEED 24 INCHES |
| | IN DEPTH PER THE FHA GUIDELINES. |
| | 11) SHT. 148-A401B - DETAIL # 1A - SHOW THE DISTANCE |
| | BETWEEN THE CABINETS . COMPLY WITH THE FHA GUIDELINES |
| | REQUIREMENT #7 AND CFR 100.205.ALSO, SEE DETAIL #1. |
| | 12) SHT.144-A352 - DETAIL # 9 - CLEARLY IDENTIFY THE |
| | SCUPPER ON THE DETAIL AND SHOW THE SCUPPER OPENING. |
| | SCUPPERS SHALL NOT HAVE AN OPENING DIMENSION LESS THAN |
| | 4 INCHES PER 2010 FBC-SEC.1107.3. |
| | 13) PLAN REVIEW COMMENT #24 - THE RESPONSE NARRATIVE |
| | REFERS TO DRAWINGS # FS-2E & FS-3E. THERE ARE NO SUCH |
| | DRAWINGS IN THIS PLAN SET. CLARIFY. |
| | 14) WHY ARE PLANS FOR "EDWARD'S PAVILLION" INCLUDED |
| | WITH THESE PLANS? |
| | 15) SHT. 2075 -A407 IS NUMBERED AS A PHASE II DRAWING |
| | IN THE NAMING CONVENTION BUT THE PLAN IS LISTED AS |
| | BEING IN PHASE I ON THE PLAN ITSELF. CLARIFY.REFER TO |
| | LOWER RIGHT HAND CORNING OF DRAWING. SHT. 2129-P4.02 |
| | WHICH ARE THE RISERS FOR THIS AREA IS NOTED AS PHASE |
| | II. WHICH IS IT? |
| | 16) SHT.2128-P4.01 - ONE OF THE RISERS IS MISSING ITS |
| | IDENTIFYING NUMBER. |
| | 17) PLAN REVIEW COMMENT # 35 - SHT. 2126-P201B & 2130- |
| | P403 - IDENTIFY THE OTHER TWO WATER MAINS AND PROVIDE |
| | THE PAGE NUMBER FOR THE CONTINUATION POINT.WPB AMEND. |
| | TO FBC SEC. 107.2.1. THE RESPONSE NARRATIVE REFERS TO |
| | REVISED SHEETS P001 & P403. THESE SHEETS HAVE NOT BEEN |
| | REVISED & P003 IS A PLUMBING SITE PLAN. CLARIFY. 2ND |
| | REQUEST. |
| | 18) PLAN REVIEW COMMENT # 37 - EXPLAIN HOW HALF OF UNIT |
| | A1C CAN BE LOCATED IN PHASE I AND THE OTHER HALF IN |
| | PHASE II. THE RESPONSE NARRATIVE NOTES THAT THE ROOM |
| | NAME HAS BEEN CHANGED TO "STORAGE". THIS HAS NOT BEEN |
| | DONE. IT IS STILL A LIVING UNIT. CLARIFY. |
| | 19) PLAN REVIEW COMMENT # 39 - SHT.2135-P501 - SHOW THE |
| | SIZE OF THE COPPER DWV LINE FROM THE WASHING MACHINE. |
| | THE MINIMUM SIZE SHALL BE 2". THE RESPONSE NARRATIVE |
| | NOTES THAT THE DETAIL HAS BEEN REMOVED FROM THE SHEET |
| | BUT IN FACT IT HAS NOT. NOTHING HAS BEEN DONE TO THE |
| | SHEET IN THE SET. CLARIFY. |
| | 20) PLAN REVIEW COMMENT # 2131-P404 - THE SIZE OF THE |
| | WATER RISERS DO NOT MATCH FROM THE 9TH TO THE 10TH |
| | FLOOR. I ASSUME THE LINES ARE BEING REDUCED BECAUSE OF |
| | THE NUMBER OF FIXTURES AT THE 10TH FLOOR. THE RESPONSE |
| | NARRATIVE REFERS TO REVISED SHT.P404 BUT THERE IS NO |
| | REVISED SHEET IN THE SET. REFER TO RISERS # |
| | 24,26,27,29,30 & 31. ALSO , THERE ARE NO PIPE SIZES ON |
| | THE RISERS ON WATER RISER #24 AT THE TENTH FLOOR |
| | LEVEL.CLARIFY. |
| | 21) PLAN REVIEW COMMENT # 41 - SHT. 2131-P404 - WATER |
| | RISER #28 IS NOT SHOWN ON THE PLAN.THE RESPONSE |
| | NARRATIVE NOTES " SEE REVISED SHEET P404. THERE IS NO |
| | REVISED SHEET P404 IN THE SET. CLARIFY. |
| | 22) PLAN REVIEW COMMENT # 53 - SHT.261-P002 - SUBMIT |
| | MANUFACTURER'S SPECIFICATION SHEETS FOR THE ELEVATOR |
| | SUMP PUMP. COMPLY WITH 2010 FBC-PLUMBING SEC.1003.4 - |
| | EXCEPTION. THE RESPONSE NARRATIVE NOTES "SEE REVISED |
| | SHEET P002. THERE IS NO REVISED SHEET P002. CLARIFY. |
| | 23) PLAN REVIEW COMMENT # 55 - SHT.262-P003 - PLUMBING |
| | KEYNOTE #3 STATES THAT THE COOLING TOWER WATER TO |
| | DISCHARGE TO THE SANITARY. COOLING WATER CANNOT |
| | DISCARGE TO THE SANITARY PER CWPB ORD. SECTION 90-126 |
| | (5). COOLING TOWER WATER SHALL NOT DRAIN TO THE |
| | STORMWATER SYSTEM PER CITY ORD. SEC.90-203. THE NOTE IS |
| | STILL ON THE PLAN. CLARIFY. |
| | 24) PLAN REVIEW COMMENT # 56 - SHT. 299- P501 SHOW THE |
| | SIZE OF THE INTERCEPTORS AS 1500 GALS. THE MAXIMUM SIZE |
| | OF AN INDIVIDUAL GREASE INTERCEPTOR CHAMBER SHALL BE |
| | 1250 GALS. PER 2010 FBC-PLUMBING SEC.1003.5.1.WHEN THE |
| | CAPACITY IS GREATER THAN 1250 GALLONS, MULTI-CHAMBERED |
| | GREASE INTERCEPTORS OR GREASE INTERCEPTORS IS SERIES |
| | SHALL BE REQUIRED. |
| | 25) PLAN REVIEW COMMENT #69 - INDICATE ON THE STORM |
| | RISER PLANS OR ON SHEETS 275-P105 & 276-P106 THAT THE |
| | DESIGN OF THE STORM DRAINAGE SYSTEM INCLUDES 1/2 THE |
| | AREA OF ANY VERTICAL WALLS THAT DIVERTS RAINWATER TO |
| | THE ROOF. THE DESIGN SHALL ALSO INCLUDE THE SQUARE |
| | FOOTAGE OF ANY SLOPED ROOF THAT DIVERTS RAINWATER TO |
| | THE FLAT ROOFS.2010 FBC-PLUMBING SEC.1106.4. |
| | 26) SHT. 268-P101C - THE NOTES AT THE GREASE TRAP ARE |
| | DIFFICULT TO READ. THERE IS OTHER TEXT OVER TOP OF |
| | IT.PLEASE CORRECT, WPB AMEND. TO FBC SEC. 107.2.1. |
| | 27) SHT.299-P501 - SHOW THE PIPE SIZES OF ALL SECTIONS |
| | OF PIPE FOR THE DOMESTIC BOOSTER WATER PUMP,WATER |
| | SOFTENER AND PRESSURE REDUCING STATION. WPB AMEND. TO |
| | FBC SEC. 107.2.1. |
| | 28) SHT. 280-P301 - THE SANITARY AND WATER RISERS FOR |
| | UNIT A1C ARE MISSING THE IDENTIFYING NUMBERS. |
| | 29) SHT.297-P412 - SHOW THE DISTANCE IN DEVELOPED |
| | LENGTH FROM EACH LINE PRESSURE REGULATOR TO THE MOST |
| | REMOTE OUTLET AND THE LOAD OF THE SECTION.SHOW THE |
| | LENGTHS OF EACH SECTION OF PIPE FOR THE 2 PSI SYSTEM |
| | AND THE LESS THAN 2 PSI SYSTEM. 2010 FBC-FUEL GAS SEC. |
| | 402.4.1, NFPA 54 SEC.6.1.3. |
| | 30) SHT.297-P412 - THE GAS RISER IS SHOWING 4,996 CFH |
| | ON A 1 1/4" LINE AT 2 PSI. THE SIZING TABLE REFERENCED |
| | ON THE DRAWING ALLOWS A MAXIMUM OF 1,470 CFH AT 2 PSI |
| | ON AN 1 1/4" LINE. IT APPEARS THE LINE IS SEVERELY |
| | UNDERSIZED.THE MINIMUM SIZE SHALL BE 2 1/2 INCHES. |
| | 31) SHT. 297-P412 - THE BTU LOAD AT POINT D ON THE |
| | DRAWING DOES NOT EQUAL THE SUM OF THE BTU'S OF THE |
| | LISTED FIXTURES. CLARIFY. |
| | 32) SHOW THE BRANCH LINES TO THE POOL AND KITCHEN AREA |
| | ON THE GAS RISER DIAGRAM AND SIZE THE LINE AND SUPPLY |
| | THE BTU LOAD FOR THE BRANCH LINES.WPB AMEND. TO FBC |
| | SEC. 107.3.5.1. |
| | 33) THE SIZE OF THE GAS LINE TO THE FIREPLACE MAY |
| | BEREQUIRED TO BE A MINIMUM OF 3/4" PER TABLE 6.2 (A) OF |
| | NFPA 54. |
| | 34) THE CFH AT THE METER SHOW 5020.3 CFH BUT THE CFH ON |
| | THE 1 1/4" LINE DOWNSTREAM OF THE METER SHOWS 4,996 |
| | CFH, WHERE DID THE ADDITIONAL LOAD AT THE METER COME |
| | FROM? CLARIFY. |
| | 35) PLEASE EXPLAIN THE NOTATION OF "8 OZ." ON THE GAS |
| | DRAWING. |
| | 36) THE PRV 'S SHALL COMPLY WITH THE FBC- FUEL GAS |
| | SEC.410.2 (4),(5), (6),& 410.3. |
| | 37)THE LINE FROM THE METER TO POINT "B" SHALL BE A |
| | MINIMUM OF 2 1/2 INCHES PER NFPA 54 TABLE 6.2 (C). |
| | 38) LIST THE CORRECT APPLICABLE GAS SIZING TABLES FOR |
| | EACH TYPE OF MATERIAL BEING USED . WPB AMEND. TO FBC |
| | SEC. 107.3.5.1.3. |
| | 39) THE BTU LOAD DOWNSTREAM OF OF POINT "D" APPEARS |
| | INCORRECT. ADDING THE 1,996 CFH FROM THE POOL AND |
| | KITCHEN AREA TO THE BTU LOAD COMES TO 3,310.3. RE-CHECK |
| | YOUR CALCULATIONS.(SEE AREA AT 2020.3 CFH). CHECK THE |
| | ENTIRE SYSTEM FOR CORRECT SIZING. |
| | 40 ) THE BTU LOAD UPSTREAM OF POINT "D" SHOULD BE |
| | 6310.3.I CALCULATE THE ENTIRE BTU LOAD ON THE SYSTEM AS |
| | 7610.3 CFH. CLARIFY. |
| | 41) PVC IS NOT PERRMITED TO BE USED TO VENT REGULATORS |
| | INDOORS PER FBC-FUEL GAS SEC.403.6.3. |
| | 42.) SHT. 297-P412 - SHOWS THE GAS PIPING BEING |
| | INSTALLED UNDER THE SLAB. THIS METHOD IS PERMITTTED IF |
| | THERE IS NO OTHER METHOD TO INSTALL THE PIPING. IF THE |
| | PIPING CAN BE RUN OVERHEAD THAT IT HOW IT SHALL BE |
| | INSTALLED. IF THERE IS NO OTHER METHOD, THE |
| | INSTALLATION SHALL COMPLY WITH 2010 FBC-FUEL GAS |
| | SEC.404.12.1 OR 404.12.2. THE VENT TO THE ROOF IS NOT |
| | AN ACCEPTED METHOD. |
| | 43) THE PLAN SHOWS PE PIPE IN THE CONDUIT. PLASTIC PIPE |
| | SHALL BE INSTALLED OUTDOORS UNDERGROUND ONLY PER |
| | FBC-FUEL GAS SEC.404.15.1. |
| | 44) PLAN REVIEW COMMENT # 77 - SHT. 297-412 - SUBMIT |
| | CALCULATIONS FOR COMBUSTION AIR IN ACCORDANCE WITH 2010 |
| | FBC-FUEL GAS SEC. 304. SUBMIT DETAILS ON THE |
| | LOCATION/TERMINATION AND TYPES OF GAS VENTS, HEIGHT |
| | ABOVE THE ROOF, ETC.THE RESPNSE NARRATIVE REFERS TO |
| | DRAWINGS M206, M503 & M505. THERE ARE NO SUCH DETAILS |
| | ON M206 AND I COULD NOT FIND A SHEET LABELED M505. |
| | CLARIFY. |
| | 45) IT APPEARS THAT CALCULATIONS FOR COMBUSTION AIR FOR |
| | THE GAS SYSTEM HAVE NOT BEEN SUBMITTED. I COULD NOT |
| | FIND THE CALCULATIONS ON ANY PLANS. CLARIFY. |
| | 46) SHT.332-M504 - DETAIL #3 REFERS TO DETAIL #6 ON |
| | SHT. 327-M404. THERE IS NO SUCH DETAIL. CLARIFY. |
| | 47) SUBMIT VENT DETAILS FOR THE POOL HEATERS . WPB |
| | AMEND. TO FBC SEC. 107.3.5.1.3. |
| | |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |