| 2015-07-31 11:56:22 | FAILED |
| | |
| | PLEASE PROVIDE WRITTEN RESPONSE TO COMMENTS. |
| | |
| | 1) PLEASE CLARIFY IF THE RETAINING WALL IS INCLUDED AS |
| | PART OF THIS PERMIT. THE SITE AND CIVIL PLANS SHOW THE |
| | MAJORITY OF THE RETAINING WALL AREA AS "NOT INCLUDED". |
| | THE FOUNDATION PLAN SHOWS MOST OF THE WALL AS INCLUDED. |
| | PRESUMABLY THE BALANCE OF THE RETAINING WALL WOULD BE |
| | INCLUDED WITH THE TRADITIONS II PERMIT. WHY SPLIT UP |
| | THE RETAINING WALL AND NOT BUILD IT UNDER ITS OWN |
| | PERMIT? |
| | |
| | 2) THE NEW RETAINING WALL IS SHOWN IN DIFFERENT |
| | LOCATIONS ON THE PLANS LISTED BELOW. PLEASE EXPLAIN WHY |
| | DIFFERING WALL LOCATIONS ARE SHOWN. |
| | |
| | SHEET L101 COTLEUR & HEARING MASTER PLAN |
| | SHEET S-1.1 ONM&J FOUNDATION PLAN |
| | SHEET 1A DUNKELBERGER LAKE BANK RETAINING WALL LOCATION |
| | PLAN - OVERVIEW (IN THE RETAINING WALL OVERALL |
| | STABILITY EVALUATION REPORT) |
| | SHEET 1B DUNKELBERGER RETAINING WALL LOCATION PLAN - |
| | DETAILED (IN THE RETAINING WALL OVERALL STABILITY |
| | EVALUATION REPORT) |
| | SHEET 1C DUNKELBERGER RETAINING WALL LOCATION PLAN - |
| | DETAILED (IN THE RETAINING WALL OVERALL STABILITY |
| | EVALUATION REPORT) |
| | |
| | 3) THE LANDSCAPE PLANS CALL FOR LITTORAL PLANTING TO |
| | THE WEST OF THE OVERLOOK PORTION OF THE RETAINING WALL. |
| | PLEASE EXPLAIN HOW THIS WILL OCCUR GIVEN THE DEPTH AND |
| | SLOPE THAT ARE BEING PROPOSED. |
| | |
| | 4) THE IRRIGATION AND LANDSCAPING REQUIRE SEPARATE |
| | PERMIT SUBMITTALS, WITH PLANS. PLEASE NOT RESUBMIT |
| | THESE SHEETS. |
| | |
| | 5) THE BUILDING FOOTPRINT MEETS ZONING REQUIREMENTS. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| | |