| Date |
Text |
| 2015-02-10 14:49:40 | THIS IS A CONCEPTUAL LEVEL REVIEW. TECHNICAL DETAILS OF |
| | THE WATER, SEWER, STORMWATER, TRAFFIC CIRCULATION, AND |
| | SOLID WASTE COLLECTION ARE BEING REVIEWED AS PART PART |
| | OF THE ENGINEERING DEVELOPMENT APPROVAL AND BUILDING |
| | PERMIT APPLICATION PROCESSES (E15010026). |
| | |
| | 1. PLEASE INCLUDE ONE COPY OF THE LANDSCAPE PLAN |
| | SHOWING THAT THE CLEAR ZONE AROUND THE FIRE HYDRANTS |
| | WILL BE MAINTAINED. A WORKING SPACE OF NOT LESS THAN 36 |
| | INCHES IN DIAMETER AND 78 INCHES IN HEIGHT SHALL BE |
| | PROVIDED AND MAINTAINED AROUND THE CIRCUMFERENCE OF |
| | FREE-STANDING FIRE DEPARTMENT CONNECTIONS. (FBC SECTION |
| | 912 AND CWPB CODE 94-302) |
| | |
| | 2. SUBMIT POTABLE WATER DEMAND, SANITARY PEAK FLOW, AND |
| | YARDAGE CALCULATIONS FOR THE POTABLE WATER, SANITARY |
| | SEWER, AND SOLID WASTE COLLECTION. |
| | |
| | 3. PLEASE REVISE THE LANDSCAPE PLAN TO SHOW LOCATIONS |
| | OF ALL WATER METERS, VALVES, CLEAN-OUTS, DRAINAGE |
| | FACILITIES, SANITARY LINES ETC. CONSIDER UTILIZING ROOT |
| | BARRIERS WHERE PLANTINGS ARE NEAR UNDERGROUND |
| | STORMWATER, SANITARY, OR POTABLE WATER LINES. |
| | |
| | 4. SUBMIT A FORMAL STRIPING PLAN FOR THE WORK WITHIN |
| | THE FLAGLER RIGHT-OF-WAY. (SEE CONDITION 2 OF SITE PLAN |
| | APPROVAL LETTER.) PLAN SHALL INCLUDE LAND DIMENSIONS, |
| | STRIPING DETAILS, ETC. OVERLAID ON AN AERIAL |
| | PHOTOGRAPH. |
| | |
| | 5. PLEASE REVISE THE SIGNING AND MARKING PLAN TO |
| | INCLUDE THE SIGNAGE MENTIONS IN CONDITION 3B OF THE |
| | SITE PLAN APPROVAL LETTER. |
| | |
| | KELLY CRANFORD, PE |
| | CITY LAND DEVELOPMENT ENGINEER |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |