2015-02-04 10:02:35PLAN REVIEW COMMENTS
  
 1ST REVIEW: FBC 2010
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY ELECTRICAL
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) FBC-R315.1 CARBON MONOXIDE PROTECTION. EVERY
 SEPARATE BUILDING OR AN ADDITION TO AN EXISTING
 BUILDING FOR WHICH A PERMIT FOR NEW CONSTRUCTION IS
 ISSUED AND HAVING A FOSSIL-FUEL-BURNING HEATER OR
 APPLIANCE, A FIREPLACE, AN ATTACHED GARAGE, OR OTHER
 FEATURE, FIXTURE, OR ELEMENT THAT EMITS CARBON MONOXIDE
 AS A BYPRODUCT OF COMBUSTION SHALL HAVE AN OPERATIONAL
 CARBON MONOXIDE ALARM INSTALLED WITHIN 10 FEET OF EACH
 ROOM USED FOR SLEEPING PURPOSES.
  
 2) SHOW COMPLIANCE WITH FBC-R314 FOR REQUIRED SMOKE
 ALARMS.
  
 3) SHOW LOCATION OF A/C EQUIPMENT AND THEIR DISCONNECTS
 ON THE ELECTRICAL PLANS. FBC 107.2.1
  
 4) NEC 210.63 - PROVIDE A GFCI PROTECTED SERVICE OUTLET
 FOR WITHIN 25' OF MECHANICAL EQUIPMENT.
  
 5) NEC 210.8 (A) (1)-(8) - GROUND-FAULT
 CIRCUIT-INTERRUPTER PROTECTION REQUIRED. ALL
 RECEPTACLES LOCATED IN THE GARAGE ARE REQUIRED TO BE
 GFCI PROTECTED.
  
 6) NEC 210.12 (B) - OUTLETS ARE REQUIRED TO BE AFCI
 PROTECTED.
  
 7) NEC 406.11 - TAMPER-RESISTANT RECEPTACLES ARE
 REQUIRED.
  
 8) NEC 210.52 (E)(1) - AT LEAST ONE RECEPTACLE OUTLET
 ACCESSIBLE WHILE STANDING AT GRADE LEVEL AND LOCATED
 NOT MORE THAN 6 1/5 FT. ABOVE GRADE SHALL BE INSTALLED
 AT THE FRONT AND BACK OF THE DWELLING.
  
 9) NEC 210.70 (A) - (C) LIGHTING OUTLETS REQUIRED. AT
 LEAST ONE WALL SWITCH CONTROLLED LIGHTING OUTLET IS
 REQUIRED ON THE EXTERIOR SIDE OF OUTDOOR ENTRANCES OR
 EXITS.
  
 10) NEC 250.50 - BOND ALL GROUNDING ELECTRODES THAT ARE
 PRESENT. NEC 250.56 - SERVICE GROUNDING ELECTRODE TO BE
 AUGMENTED BY AN ADDITIONAL ELECTRODE 6 FEET AWAY OR
 PROVIDE EVIDENCE OF RESISTANCE TO GROUND OF 25 OHMS OR
 LESS.
  
 11) NEC 250.94 - INTERSYSTEM BONDING TERMINATION SHALL
 BE PROVIDED.
  
 12) IT APPEARS THAT YOUR CALCULATIONS FOR THE
 UNBALANCED NEUTRAL LOAD ARE INCORRECT. BASED ON YOUR
 CALCULATION RESULT OF 155 AMPS, THE 1/0 NEUTRAL FEEDER
 FROM THE METER TO PANEL A IS TOO SMALL. NEC 220.16 AND
 220.61
  
  
  
  
  
  