2015-12-21 18:26:56RESIDENTIAL (R3) ADDITION/ALTERATION, THIRD BUILDING
 REVIEW CHECKLIST.
 CODE: 2010 FBC.
  
 1- FLAT ROOF LIQUID ROOFING NOA 13-0204.17 SUBMITTED:
 A) CLEARLY IDENTIFY WHICH APPROVED ASSEMBLY IS GOING TO
 BE INSTALLED TO VERIFY COMPLIANCE WITH THE DESIGN
 PRESSURES OF SEC. R301 OF 2010 FBC.
 NOTE: THREE ASSEMBLIES WITH DESIGN PRESSURES OF -60PSF
 WERE UNDERLINED ON NOA SUBMITTED. THESE THREE
 ASSEMBLIES ARE FOR INSULATED ROOF SYSTEMS. PLANS DON'T
 SPECIFY INSULATED ROOF SYSTEMS. CLARIFY/REVISE AS
 REQUIRED TO MATCH.
  
 B) PROVIDE SIGNED AND SEALED RAS 117 CALCULATIONS AS
 REQUIRED BY GENERAL LIMITATION #7 ON LAST PAGE OF NOA
 SUBMITTED. NEED CALCULATIONS TO MEET THE DESIGN
 PRESSURES OF SEC. R301.
 NOTE: ASSEMBLIES THAT ARE LIMITED BY GENERAL LIMITATION
 #9 CAN NOT BE USED BECAUSE THEY DON'T ALLOW ENHANCED
 FASTENING. SEE GENERAL LIMITATION #9 ON-LAST PAGE OF
 NOA SUBMITTED.
  
 2- ENERGY CALCULATIONS SUBMITTED:
 A) REVISE FORM 402-2010. SEC. 103.2.2 OF 2010
 FBC-ENERGY CONSERVATION.:
 (1)ANSWERS FOR ITEMS #6(A) IS INCORRECT. SEE GENERAL
 INSTRUCTION NOTE #2 ON FIRST PAGE OF FORM.
  
 (2) NEED TO ANSWER ITEM #6(B). SEE GENERAL INSTRUCTION
 NOTE #2 ON FIRST PAGE OF FORM.
  
 (3) ITEM # 8(A). THERE IS NOT R-VALUE REQUIREMENT FOR
 FOR SLAB ON GRADE. ON THE OTHER HAND, ANY R-VALUE IS
 FOR THE INSULATION MATERIAL ONLY. SEE NOTE #3 ON SECOND
 PAGE OF FORM SUBMITTED.
  
 (4) ITEM #9 IS INCORRECT. INSULATION ON CONCRETE BLOCK
 WALL NEED TO COMPLY WITH NOTE #3 ON SECOND PAGE OF FORM
 SUBMITTED.
 NOTE: NEED TO COMPLY WITH THE R-VALUE FOR THE INTERIOR
 AND EXTERIOR OF THE WALL.
  
 (5) ITEM #14. A/C EQUIPMENT IS NOT ALLOWED TO BE
 OVERSIZED. SEC. 403.6.1.1 OF 2010 FBC-ENERGY
 CONSERVATION.
  
 3- PROVIDE MANUFACTURER'S SPECIFICATIONS FOR WINDOWS
 U-FACTOR AND SHGC FACTOR SHOWN ON THE ENERGY
 CALCULATIONS. SEC. 103.2.2 AND SEC. 303.1.3 OF 2010
 FBC-ENERGY CONSERVATION.
  
 NOTE: THE ENGINEER OF RECORD MAY BE CHARGED FOUR TIMES
 THE PLAN REVIEW FEE IF THE ENERGY CALCULATIONS ARE
 DENIED FOR A FOURTH TIME. SEE F.S. 553.80(2)(B)
  
 ***PLEASE PROVIDE RESPONSE LETTER CLEARLY ADDRESSING
 EACH COMMENT TO EXPEDITE THE REVIEW PROCESS.
 *** PLEASE REPLACE AND REMOVE ANY REVISED DRAWING.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved