| 2014-12-15 07:57:42 | PLAN REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC 2010 |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | BUILDING |
| | |
| | 1) THE NEW PRODUCT APPROVALS (MI SINGLE HUNG WINDOWS, |
| | FIXED WINDOWS AND SLIDING GLASS DOORS) THAT WERE |
| | SUBMITTED ARE INCOMPLETE. THE INSTALLATION INSTRUCTIONS |
| | ARE REQUIRED. SUBMIT COMPLETE PRODUCT APPROVALS FOR THE |
| | ITEMS THAT WILL BE INSTALLED AS REQUIRED BY DCA RULE |
| | 9N-3. |
| | |
| | 2) THERE WERE NO PRODUCT APPROVALS SUBMITTED FOR NEW |
| | STRUCTURAL MULLIONS. THE ONES THAT WERE SUBMITTED AND |
| | APPROVED ORIGINALLY ARE FROM LAWSON AND THE REVISED |
| | WINDOWS ARE MI. FBC 107.3.4 - PROVIDE TWO SETS OF |
| | PRODUCT APPROVALS FOR THOSE PRODUCTS WHICH ARE |
| | REGULATED BY DCA RULE 9N-3 THAT HAVE BEEN REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| | |
| | 3) PROVIDE TWO COPIES OF THE WIND RESISTANCE TEST |
| | REPORTS ( ASTM E 330 ) FOR THE "ELDORADO STONE" WALL |
| | COVERING. FBC-R 703.1.2 |
| | |
| | 4) IN THE DOOR/WINDOW SCHEDULE ON SHEET A3.0, THE |
| | DESIGN PRESSURES ( +38.6 PSF, -40.0 PSF) FOR SLIDING |
| | GLASS DOOR " 4D" DO NOT MATCH THE PRESSURES SPECIFIED |
| | FOR THIS DOOR ON PLAN SHEETS A1.0 AND A1.1 (+38.1 PSF, |
| | -42.9 PSF). FBC 107.2.1 |
| | |
| | 5) THERE WERE NOT ANY CHANGES ON SHEETS A2.0, A2.1 AND |
| | P1.0 FROM THE APPROVED PLANS. OTHER THAN THE ITEMS |
| | LISTED IN REVIEW NOTE #4, THE OTHER REVISED PLAN SHEETS |
| | WERE OKAY. THERE WERE A TOTAL OF THIRTEEN (13) REVISED |
| | PLAN SHEETS AND THREE (3) REVISED PRODUCT APPROVALS. |
| | THIS DOES NOT INCLUDE THE WINDOW MULLION PRODUCT |