| 2015-03-07 18:09:23 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | 1. SCOPE NOT CLEAR. PLANS FOR RENOVATION WERE |
| | SUBMITTED, BUT THIS IS BEING REVIEWED UNDER ANOTHER |
| | PERMIT. PLEASE REMOVE SHEETS RELATED TO CONSTRUCTION |
| | AND SUBMIT ONLY DEMO SHEETS. MECHANICAL SHEETS NOT |
| | REVIEWED AT THIS TIME AS THEY ARE BEING REVIEWED UNDER |
| | ANOTHER PERMIT. |
| | |
| | 2. HOW WILL THE STRUCTURE BE KEPT SECURE IF WINDOWS ARE |
| | REMOVED? WINDOW REMOVAL WILL BE REMOVED FROM SCOPE OF |
| | WORK UNLESS CONTRACTOR ADDRESSES THIS ISSUE, FBC 107. |
| | |
| | 3. ELEVATION CERTIFICATE WAS NOT PROVIDED, AND THERE |
| | ARE CONFLICTING ELEVATIONS ON THE PLAN. THIS PERMIT |
| | WILL NOT BE ISSUED WITHOUT AN ELEVATION CERTIFICATE. |
| | |
| | 4. PRIOR TO ISSUANCE OF A DEMO PERMIT, PLANS ARE TO |
| | INDICATE HOW THE STRUCTURE WILL BE BROUGHT INTO FULL |
| | COMPLIANCE. FLOOD VENTS MAY BE REQUIRED IN THE CRAWL |
| | SPACE. THE GARAGE MAY NEED TO BE RAISED OR VENTS |
| | INSTALLED. THIS APPLIES TO THE WALKWAY, DEPENDING ON |
| | WHETHER IT IS OPEN OR ENCLOSED. THE FIRST STEP IS A |
| | SIGNED AND SEALED ELEVATION CERTIFICATE WITH |
| | PHOTOGRAPHS OF ALL SIDES OF THE STRUCTURE(S). A |
| | COMPLETE REVIEW CANNOT BE PERFORMED WITHOUT THIS |
| | INFORMATION. |
| | |
| | FOR YOUR CONVENIENCE, NFIP REVIEW: |
| | |
| | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | 1. AS THE PROPOSED RENOVATION CONSTITUTES A SUBSTANTIAL |
| | IMPROVEMENT, PROVIDE A COPY OF THE ELEVATION |
| | CERTIFICATE FOR THIS STRUCTURE. THIS MAY BE SENT VIA |
| | EMAIL FOR PRELIMINARY REVIEW. |
| | |
| | BASED ON THE SITE PLAN, IT APPEARS THAT: |
| | |
| | THE HOUSE FINISHED FLOOR IS IN COMPLIANCE (OVER 7.5') |
| | |
| | NO INFORMATION PROVIDED REGARDING MECHANICAL EQUIPMENT |
| | (MUST BE OVER 7.5') |
| | |
| | THE GARAGE FLOOR IS AT 6.68'. THIS DOES NOT COMPLY WITH |
| | THE MINIMUM 7.5'). ARE FLOOD VENTS INSTALLED IN THE |
| | GARAGE? IS THE GARAGE TO BE RAISED? SHEET A2 SHOWS |
| | GARAGE ELEVATION AS 10'1" AND AS 7'. PROPOSED |
| | CONSTRUCTION NOT CLEAR. |
| | |
| | IS THE BREEZEWAY ENCLOSED? WILL THIS BE RAISED? |
| | |
| | THE ELEVATION CERTIFICATE SHOULD PROVIDE THE |
| | INFORMATION REQUIRED TO DETERMINE ACTIONS WHICH WILL BE |
| | REQUIRED FOR ISSUANCE. |
| | |
| | PLEASE PROVIDE A CURRENT ELEVATION CERTIFICATE WHICH |
| | SHOWS EXISTING CONDITIONS. |
| | |
| | THREE ADDITIONAL ELEVATION CERTIFICATES WILL BE |
| | REQUIRED: |
| | |
| | CONSTRUCTION DOCUMENTS (PLEASE PROVIDE AT THIS TIME, |
| | SHOWS ELEVATIONS PROPOSED) |
| | BUILDING UNDER CONSTRUCTION (WILL BE REQUIRED AT |
| | INSPECTION) |
| | FINISHED CONSTRUCTION (WILL BE REQUIRED PRIOR TO |
| | CERTIFICATE OF COMPLETION, AFTER FINISHED GRADE AND ALL |
| | MECHANICAL EQUIPMENT HAS BEEN INSTALLED) |
| | |
| | 2. DOCUMENTS PREPARED BY AN ARCHITECT AND SUBMITTED FOR |
| | PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED ORIGINALS |
| | FS 481. |
| | |
| | |
| | |
| | |
| | |