| Plan Review Notes For Permit 14120014 |
| Permit Number |
14120014 |
|
| Review Stop |
R |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-12-29 14:42:24 | TRUSS DRAWING REVIEW | | | | | | DENIED | | | | | | 1) THE TRUSS LAYOUT IS REQUIRED TO BE REVIEWED AND | | | APPROVED BY THE DESIGNER OF RECORD FOR THE PROJECT. FAC | | | 61G15-31.003 | | | 2) THERE IS A SEPARATE SIGNED AND SEALED DRAWING OF | | | TRUSS A2 THAT APPEARS TO SHOW THAT THE TRUSS IS TO BE | | | FIELD MODIFIED TO CREATE A CATHEDRAL CEILING IN THE | | | BATHROOM. THE SIGNATURE ON THE DRAWING IS A COPY AND IS | | | NOT ACCEPTABLE. THE ENGINEER'S ORIGINAL HANDWRITTEN | | | SIGNATURE IS REQUIRED. FAC 61G15-23.002 | | | 3) THE APPROVED PLANS SHOW A WOOD FRAME GABLE END WITH | | | A TOP PLATE. THE GABLE END WALL SECTION ON SHEET A2.1 | | | (WHICH SHOULD BE A2.0) SHOWS BRACING AND TRUSSES WITH | | | BOTTOM CORDS THAT ARE LEVEL WITH THE JOINT IN THE | | | EXTERIOR FRAME WALL AND THE GABLE FRAMING. BECAUSE THE | | | GABLE END WALL IS NOT BALLOON FRAMED, THE PLANS WILL | | | NEED TO BE REVISED TO SHOW HOW THE HINGE EFFECT AT THE | | | END WALL WILL BE ADDRESSED IF THE TRUSSES ARE MODIFIED. | | | FBC 2318.1.8.2 & FBC 107.2.1 | | | 4) THE GABLE END WALL IS REQUIRED TO BE FIREBLOCKED | | | WHERE THE VAULTED CEILING INTERSECTS THE WALL. FCB-R | | | 302.11 | | | |
|