| Plan Review Notes For Permit 14110950 |
| Permit Number |
14110950 |
|
| Review Stop |
E |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2014-12-29 12:59:58 | 12/29/2014 | | | PROJECT: TOWER 1 | | | PERMIT#: 14110950 | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | 2ND ELECTRICAL PLAN REVIEW | | | ACTION: PROVISO | | | | | | 1) PROVIDE A LOAD CALCULATION, AND A RISER DIAGRAM WITH | | | A FEEDER SCHEDULE TO INDICATE THE CONDUIT, SERVICE AND | | | CONDUCTOR SIZES FOR FUTURE EQUIPMENT SHELTER. | | | FBC-107.3.5.3, NEC 215.5 | | | | | | 2) PROVIDE SAFETY LABELING FOR ARC FLASH PROTECTION FOR | | | THE PANEL BOARDS AND MAIN DISCONNECTING MEANS. NEC | | | 110.16, 110.22 INDICATE THE REQUIRED ARC FLASH | | | PROTECTION ON FUTER ELECTRICAL EQUIPMENT. | | | | | | 3) A SEPARATE PERMIT IS REQUIRED FOR THE FUTURE | | | GENERATOR, FUEL TANK, AND EQUIPMENT SHELTER. | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | | | | |
|