| Plan Review Notes For Permit 14110491 |
| Permit Number |
14110491 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-11-13 07:21:53 | PLUMBING PROVISO: | | | | | | 1) 2010 FBC-P 712.2 VALVES REQUIRED. | | | A CHECK VALVE AND A FULL OPEN VALVE LOCATED ON THE | | | DISCHARGE SIDE OF THE CHECK VALVE SHALL BE INSTALLED | | | IN THE PUMP OR EJECTOR DISCHARGE PIPING BETWEEN THE | | | PUMP OR EJECTOR AND THE GRAVITY DRAINAGE SYSTEM. | | | ACCESS SHALL BE PROVIDED TO SUCH VALVES. SUCH VALVES | | | SHALL BE LOCATED ABOVE THE SUMP COVER REQUIRED | | | BY SECTION 712.1 OR, WHERE THE DISCHARGE PIPE FROM THE | | | EJECTOR IS BELOW GRADE, THE VALVES SHALL BE ACCESSIBLY | | | LOCATED OUTSIDE THE SUMP BELOW GRADE IN AN ACCESS PIT | | | WITH A REMOVABLE ACCESS COVER. | | | | | | 2) 2010 FBC-P 712.3.5 EJECTOR CONNECTION TO THE | | | DRAINAGE SYSTEM. | | | PUMPS CONNECTED TO THE DRAINAGE SYSTEM SHALL CONNECT TO | | | THE BUILDING SEWER OR SHALL CONNECT TO A WYE | | | FITTING IN THE BUILDING DRAIN A MINIMUM OF 10 FEET | | | (3048 MM) FROM THE BASE OF ANY SOIL STACK, WASTE STACK | | | OR FIXTURE DRAIN. WHERE THE DISCHARGE LINE CONNECTS | | | INTO HORIZONTAL DRAINAGE PIPING, THE CONNECTOR SHALL BE | | | MADE THROUGH A WYE FITTING INTO THE TOP OF THE DRAINAGE | | | PIPING. | | | |
|