| Plan Review Notes For Permit 14110342 |
| Permit Number |
14110342 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-11-08 11:37:26 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. PROVIDE A FLOOR PLAN WHICH SHOWS PROPOSED LOCATIONS | | | OF PROPOSED NEW SHUTTERS, FBC 107. A PLAN WAS PROVIDED | | | BUT THE OPENINGS ARE NOT NUMBERED TO CORRELATE WITH THE | | | INSTALLATION SCHEDULE. | | | | | | 2. THE SHUTTER INSTALLATION SCHEDULE IS INCOMPLETE. | | | PROVIDE SPAN AND SHUTTER GLASS SEPARATION AND SELECT | | | ONE SHUTTER CONNECTION MOUNTING TYPE. I HAD PROVIDED | | | THE INFORMATION WHICH CONTRACTORS FIND MOST DIFFICULT | | | TO COMPLETE. CONTRACTOR IS TO PROVIDE THE REMAINING | | | INFORMATION WITH THE EXCEPTION OF WALL PRESSURES | | | (COLUMN 3) AND THE LAST COLUMN. THE EXAMPLE I GAVE WAS | | | AN EXAMPLE. I PROVIDED WORST CASE FOR C1 AND C2. PLEASE | | | PROVIDE AN INSTALLATION SCHEDULE WHICH SPECIFIES WHICH | | | ONE OF THE TWO METHODS WILL BE INSTALLED; FBC 107, FBC | | | 2010 RESIDENTIAL 301. | | | | | | 3. IMPACT DOOR PRODUCT APPROVALS WERE PROVIDED. FOR | | | THIS SHUTTER PERMIT, ONLY SHUTTER INFORMATION IS | | | REQUIRED. THE DOOR PRODUCT APPROVALS SHOULD BE INCLUDED | | | EITHER IN THE ORIGINAL PERMIT APPLICATION OR THE | | | PENDING REVISION #14110277. | | | | | | | | | |
|