| Date |
Text |
| 2014-11-25 08:59:09 | 11/25/2014 |
| | PROJECT: PARMALEE RESIDENCE |
| | PERMIT#: 14110286 |
| | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC |
| | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | 1ST ELECTRICAL PLAN REVIEW |
| | ACTION: DENIED |
| | |
| | 1) TWO COPIES OF ALL PLANS AND SPECIFICATIONS ARE |
| | REQUIRED FOR SUBMITTAL WITH AN APPLICATION FOR PERMIT. |
| | ONCE REVIEWED AND READY FOR ISSUANCE, ONE SET TO BE |
| | RETAINED BY THE BUILDING OFFICIAL FOR THE PURPOSE OF |
| | RECORD KEEPING AND THE OTHER TO BE RETURNED TO THE |
| | APPLICANT UPON ISSUANCE OF THE PERMIT. WPB AMENDMENTS |
| | TO THE FBC 107.3.1 SUBMITTAL DOCUMENTS. |
| | |
| | 2) FOR PERMITTING PURPOSES, VALUATION OF BUILDINGS AND |
| | SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE |
| | STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, INTERIOR |
| | FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN |
| | FEES, MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| | ONLY LAND VALUE. FBC WPB AMENDMENTS. SECTION 109.3. |
| | REVISE THE VALUE ON THE APPLICATION OR PROVIDE |
| | SUPPORTING DOCUMENTATION OF THE ACTUAL COST OF THE |
| | ELECTRICAL INSTALLATION INCLUDING ALL OF THE ABOVE |
| | REFERENCED CRITERIA. |
| | |
| | 3) REVISE THE RISER DIAGRAM TO INDICATE AN APPROVED |
| | CONDUCTOR SIZE ADEQUATE TO SUPPORT THE 250AMP MAIN IN |
| | PANEL A. THE 3/0 CONDUCTORS IN THE RISER ARE |
| | UNDERSIZED. NEC 310.15(B(6) OR 310.16 |
| | |
| | 4) PROVIDE A REVISED PANEL SCHEDULE FOR PANEL A. EVERY |
| | CIRCUIT AND CIRCUIT MODIFICATION SHALL BE LEGIBLY |
| | IDENTIFIED AS TO ITS CLEAR, EVIDENT, AND SPECIFIC |
| | PURPOSE OR USE. NEC 408.4 |
| | |
| | 5) PROVIDE A PANEL SCHEDULE FOR NEW PANEL B. EVERY |
| | CIRCUIT AND CIRCUIT MODIFICATION SHALL BE LEGIBLY |
| | IDENTIFIED AS TO ITS CLEAR, EVIDENT, AND SPECIFIC |
| | PURPOSE OR USE. NEC 408.4 |
| | |
| | 6) INDICATE THE LOCATIONS OF THE NEW CIRCUITRY ON THE |
| | PLANS. IDENTIFY THE VOLTAGE OF EACH CIRCUIT, THE |
| | CIRCUIT NUMBERS CORRESPONDING TO THE PANEL SCHEDULE AND |
| | THE LOCATION OF THE REMOTE TRANSFORMERS. |
| | |
| | 7) REVISE LOAD CALCULATION AS DESCRIBED IN THE NEC |
| | 220.12 , 220.14. LOADS FOR NEW CIRCUITS OR EXTENDED |
| | CIRCUITS IN PREVIOUSLY WIRED DWELLING UNITS SHALL BE |
| | CALCULATED IN ACCORDANCE WITH EITHER 220.12 OR 220.14, |
| | AS APPLICABLE. NEC 220.16(2) |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. SEE LINK: |
| | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| | |
| | ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO |
| | SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED |
| | SHEETS FOR COMPARATIVE REVIEW. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |