| Plan Review Notes For Permit 14101073 |
| Permit Number |
14101073 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-11-06 05:08:57 | 1) THE GAS SIZING TABLE THAT YOU HAVE REFERENCED ON THE | | | GAS DRAWING IS FROM AN OUTDATED EDITION OF THE CODE. | | | THIS TABLE NUMBER IN THE 2010 FL. GAS CODE IS FOR CSST, | | | NOT PE. SUBMIT 2 COPIES OF THE CORRECT GAS SIZING TABLE | | | FROM THE 2010 FGC WHICH IS THE CODE IN EFFECT, NOT THE | | | 2001 EDITION. | | | 2) SUBMIT 2 COPIES OF A CLEAR AND LEGIBLE PLAN OF THE | | | DRAWING FROM AMERICAN WELDING & TANK CO. WPB AMEND. TO | | | 2010 FBC SEC.107.2.1. | | | 3) SUBMIT 2 CLEAR AND LEGIBLE COPIES OF THE DRAWING | | | FROM NFPA FOR THE TANK LOCATIONS. THE CODE EDITION IN | | | EFFECT IS THE 2008 EDITION, NOT THE 1996 EDITION THAT | | | YOU SUBMITTED. WPB AMEND. TO 2010 FBC SEC.107.2.1. | | | 4) INDICATE THE DISTANCE OF THE LP TANK FROM THE | | | DRIVEWAY. COMPLY WITH NFPA 58 SEC.6.6.6 .1 (D). | | | 5) SUBMIT TWO COPIES OF THE SIGNED AND SEALED DRAWINGS | | | FOR THE AMERICAST SLAB. WPB AMEND. TO 2010 FBC | | | SEC.107.2.1. | | | 6) SUBMIT DOCUMENTATION THAT THE GENERATOR IS LISTED | | | AND LABELED IN ACCORDANCE W/ 2010 FGC SEC. 301.3. | | | 7) STATIONARY GENERATORS SHALL MEET THE REQUIREMENTS OF | | | UL 22OO PER THE 2010 FGC SEC.616.1. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|