| 2014-11-26 15:06:31 | 11/26/2014 |
| | PROJECT: 533 CLEMATIS |
| | PERMIT#: 14100819 |
| | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC |
| | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | 1ST ELECTRICAL PLAN REVIEW |
| | ACTION: DENIED |
| | |
| | 1) REVISE PANEL SCHEDULE FOR PANEL KI AND MDP CIRCUITS |
| | IN OFFICE AS BATHROOM AND LOAD CALCULATION AND THERE IS |
| | NO CIRCUIT IN MDP INDICATED FOR SUB-PANEL K2.. EVERY |
| | CIRCUIT AND CIRCUIT MODIFICATION SHALL BE LEGIBLY |
| | IDENTIFIED AS TO ITS CLEAR, EVIDENT, AND SPECIFIC |
| | PURPOSE OR USE. NEC 408.4 REVISE PANEL SCHEDULE AND |
| | LOAD CALCULATION FOR PANEL MDP. |
| | |
| | 2) REVISE RISER DIAGRAM FOR CLARITY AND ACCURACY. THE |
| | RISER DIAGRAM INDICATE A 250AMP PANEL K1 BEING FED FROM |
| | PANEL MDP WITH 4, #4/0 AND 1,#8 #6 AND A 225AMP PANEL |
| | K2 BEING FED FROM PANEL MDP WITH 4,#3 AND 1,#8. NONE OF |
| | THIS IS ADAQUATE TO SUPPORT THE LOAD PROPOSED TO BE |
| | FED. NEC 310.16 |
| | |
| | 3) CLARIFY THE SCOPE OF WORK. THE DESCRIPTION OF WORK |
| | ON THE APPLICATION AND ON THE PLAN ARE CONFLICTING. |
| | CLARIFY WHAT THE ACTUAL SCOPE OF WORK IS AND WHAT IS |
| | EXISTING TO REMAIN, WHAT IS PROPOSED TO RENOVATED AND |
| | WHAT IS TO BE INSTALLED NEW. |
| | |
| | 4) THE RISER DIAGRAM ON SHEET 2.1E STATES "ALL APNELS |
| | AND SERVICES ARE EXISTING" YET THE RISER DIAGRAM ITSELF |
| | INDICATES A NEW SERVICE FOR THE RESTAURANT. A NEW |
| | 400AMP MAIN, FEEDER MDP, K1 & K2, |
| | |
| | 5) THERE IS REFERENCE TO NOTES ON SHEET 2.1E BUT THERE |
| | ARE NO NOTES. THERE ARE ALSO TWO SHEETS #2.1E CLARIFY. |
| | |
| | 6) THERE IS A REFLECTED CEILING PLAN BUT THERE IS NO |
| | ELECTRICAL LIGHTING PLAN. PROVIDE ELECTRICAL LIGHTING |
| | PLANS INDICATING HOW THE LIGHTING IS PROPOSED TO BE |
| | CONTROLED. CLARIFY |
| | |
| | THERE IS A NOTE ON SHEET 2.1E THAT STATES |
| | "RECIRCULATING PUMPS CEILING SPACE MOUNTED" BUT THERE |
| | IS NO CIRCUITRY OR CONTROLS INVOLOVING ANY |
| | RECIRCULATING PUMPS. CLARIFY. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. SEE LINK: |
| | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| | |
| | ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO |
| | SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED |
| | SHEETS FOR COMPARATIVE REVIEW. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |